
2-10 t/h (series to 100 t/h)
DZL Chain Grate Biomass Steam Boiler
Packaged three-pass biomass steam boiler, 2-10 t/h at up to 1.6 MPa, with a light chain grate and water-cooled arches.
View detailsA 4 t/h biomass boiler on rubber wood waste and rice husk supplies vulcanising and moulding steam at a footwear plant in Ho Chi Minh City.

The plant in Ho Chi Minh City moulds rubber soles and assembles footwear. Steam heats the vulcanising presses through a manifold and supplies two autoclaves and a small boiler for the plant’s hot water. The load is 2.5-3.2 t/h, with a 3.6 t/h peak when the autoclaves start together.
The boiler is a 4 t/h DZL chain-grate unit at 1.0 MPa, burning rubber wood waste from a nearby furniture cluster and rice husk from the Mekong. The plant switched from oil after a fuel-price spike and has stayed on biomass since.
Rubber wood offcuts are chipped and dried to 20-25% moisture; rice husk arrives at 10-12%. The plant runs about 60% wood and 40% husk. Husk burns fast and light, wood burns slower and hotter, and the chain grate handles the mix well as long as the bed is kept at 120-150 mm and the primary air is zoned.
At 4 t/h the boiler absorbs about 2.8 MW. On a 14.5 MJ/kg mix the fuel rate is about 720 kg/h, and the plant’s covered store holds ten days of fuel.
| Item | Value |
|---|---|
| Rated evaporation | 4 t/h |
| Pressure | 1.0 MPa |
| Fuel | rubber wood, rice husk |
| Fuel rate at rating | about 720 kg/h |
| Efficiency | about 78% |
| Dust control | multi-cyclone plus wet scrubber |
The plant is in an industrial zone with housing nearby, and the local authority required more than a cyclone. The flue gas passes a multi-cyclone and then a simple wet scrubber – a packed tower with water recirculation – which brings dust below 50 mg/Nm3 and absorbs part of the SO2. The scrubber’s water is settled and the sludge goes to a licensed disposal site.
Ash from the grate is sold to a brick works; fly ash from the scrubber is dewatered and disposed of with the sludge.
The boiler was installed in five weeks and commissioned in seven days. The first month produced a problem with the fuel feeder: husk bridged in the hopper during the rainy season, and the plant added a vibrator and a wider outlet. The grate needed a new set of bars after eight months, which the plant now treats as a planned annual job.
The boiler holds 0.95 MPa at the press manifold through the shift, and the autoclaves reach 0.6 MPa in the expected time. The plant estimates a 35% reduction in steam cost against oil.
External links open the publisher’s website and are provided for background reading.
Yes, with a zoned air supply and a bed depth around 120-150 mm. Husk needs a faster grate and wood needs a deeper bed, so the mix is a compromise.
A cyclone alone is usually not enough. A wet scrubber or bag filter brings dust below 50 mg/Nm3 and reduces the visible plume.
About 700-750 kg/h of 14-15 MJ/kg fuel at rating, depending on moisture.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.