
0.5-4 t/h (series to 100 t/h)
DZ(H)L Coal-Fired Steam Boiler
Double-drum chain-grate coal boiler, 0.5-4 t/h packaged, for AII bituminous coal at 0.7-1.6 MPa.
View detailsThe DZL4-1.25-AII is a 4 t/h single-drum chain-grate coal steam boiler producing 1.25 MPa steam at 194 °C. It fires bituminous coal, anthracite or lignite at 84% efficiency (LHV), consuming 571 kg/h at rated output.

The DZL4-1.25-AII is a 4 t/h unit from the DZL coal steam boiler series. It is a single-drum, chain-grate design with threaded smoke tubes, built around coal firing. Rated steam output is 4 t/h at 1.25 MPa and 194 °C, with thermal efficiency of 84% on a lower heating value (LHV) basis.
At 4 t/h, this boiler fits plants whose steam demand sits in the low-to-mid industrial range: process heating, drying, and general steam supply where load is steady through the working day. It is a common choice where a 2 t/h unit would run short at peak and a 6 t/h unit would spend most of its life at low firing rates.
The boiler fires bituminous coal, anthracite and lignite. The rated fuel figure is 571 kg/h, derived for bituminous coal at 5,000 kcal/kg and 84% efficiency (LHV basis). The calculation takes the heat required to raise 4 t/h of feedwater to 1.25 MPa, 194 °C steam, divides by the LHV efficiency, and converts to coal mass at the stated calorific value. Coal of lower calorific value raises the mass rate proportionally; anthracite and lignite behave differently in the grate and should be assessed against the coal actually available.
A 4 t/h chain-grate boiler is typically operated between roughly half and full rating for stable combustion. Below that band, the grate and coal bed need more attention to hold a clean fire, and excess air tends to rise, which pulls efficiency below the 84% rated figure. The threaded smoke tubes support heat transfer across the load range. Plan the steam load so the boiler spends most of its hours in its stable band rather than cycling.
As a single-drum chain-grate unit, the boiler needs floor area for the pressure part, the grate and its drive, the coal feed, and the ash discharge at the rear. Allow working space for tube access, grate maintenance and ash removal, plus headroom for the drum and any top-mounted connections. Foundation loading, flue routing and coal storage are project-specific; confirm them against the general arrangement drawing for your site.
Feedwater and boiler water quality must be controlled to protect the drum, tubes and threaded smoke tubes from scale and corrosion. Softening or demineralisation, plus internal chemical treatment and routine blowdown, is normal practice for a boiler of this type. Set the programme to the feedwater analysis at your site; scale on the gas side of threaded tubes is difficult to remove and directly reduces efficiency.
The unit is supplied with combustion and feedwater controls matched to chain-grate operation: grate speed, forced and induced draft, and feedwater regulation responding to drum level and steam pressure. Instrumentation and safety interlocks are specified per project. Confirm the control scope, burner/control package and interface with your plant system at the enquiry stage.
Choose the 4 t/h model when your sustained steam demand sits near this figure with limited peaks. Stepping down to a smaller unit leaves little margin for peak demand and can force continuous full firing; stepping up adds capital and floor space and leaves the boiler running at low load, where efficiency and combustion stability suffer. The 4 t/h rating keeps the unit in its efficient band for a typical low-to-mid industrial steam profile.
| Parameter | Value |
|---|---|
| Model | DZL4-1.25-AII |
| Capacity | 4 t/h |
| Pressure | 1.25 MPa |
| Steam temperature | 194 °C |
| Feedwater temperature | To be confirmed per project |
| Fuel | Bituminous coal, anthracite, lignite |
| Fuel consumption at rated output | 571 kg/h (bituminous coal, 5,000 kcal/kg, 84% efficiency) |
| Efficiency | 84% (LHV basis) |
| Burner/control | Chain-grate firing with combustion and feedwater controls, specified per project |
| Application | Process steam, drying and general industrial steam supply |
Rated output is 4 t/h at 1.25 MPa and 194 °C. For stable chain-grate combustion, plan sustained operation in the upper part of the load range rather than long periods at very low firing rates.
It is based on bituminous coal at 5,000 kcal/kg and 84% efficiency (LHV basis) at rated output. Coal with a different calorific value changes the mass rate; anthracite and lignite also need separate assessment for the grate.
The series lists bituminous coal, anthracite and lignite as fuels. Because the rated fuel figure is stated for bituminous coal, confirm the fuel you intend to use and its characteristics when specifying the unit.
| Model | DZL4-1.25-AII |
|---|---|
| Capacity | 4 t/h |
| Pressure | 1.25 MPa |
| Steam temperature | 194 °C |
| Feedwater temperature | To be confirmed per project |
| Fuel | Bituminous coal, anthracite, lignite |
| Fuel consumption at rated output | 571 kg/h (bituminous coal, 5,000 kcal/kg, 84% efficiency) |
| Efficiency | 84% (LHV basis) |
| Burner/control | Chain-grate firing with combustion and feedwater controls, specified per project |
| Application | Process steam, drying and general industrial steam supply |
External links open the publisher’s website and are provided for background reading.
Include the capacity (t/h or MW), fuel, working pressure and site country so the proposal matches your permit limits.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.