View detailsA 2 t/h biomass boiler on rubber wood and cinnamon waste supplies pressing and finishing steam at an apparel plant in Colombo, cutting fuel cost and CO2.

The apparel plant in Colombo cuts, sews and finishes knitwear for export. Its steam load is small but constant: pressing tables, a steam tunnel, an ironing line and the plant’s hot water. Demand is 0.8-1.2 t/h through two shifts, with a 1.5 t/h peak at shift start.
The boiler is a 2 t/h DZL chain-grate unit at 0.8 MPa, firing rubber wood offcuts and cinnamon peel waste from a spice processor. The plant chose biomass for its sustainability reporting as much as for cost: its buyers ask for scope 1 emissions data, and a biomass boiler is easier to defend than oil.
At 2 t/h and 0.8 MPa the boiler absorbs about 1.35 MW. On a 14 MJ/kg wood mix the fuel rate is about 350 kg/h, or roughly 7 t a day. The plant’s store holds two weeks of fuel, and the supplier delivers in 5 t loads.
The fuel is chipped to 30-50 mm and dried under cover. The plant learned in the first monsoon that uncovered wood at 35% moisture would not hold the furnace temperature; a simple roofed store and a two-week rotation solved it.
| Item | Value |
|---|---|
| Rated evaporation | 2 t/h |
| Pressure | 0.8 MPa |
| Fuel | rubber wood, cinnamon waste |
| Fuel rate at rating | about 350 kg/h |
| Efficiency | about 76% |
| Dust control | multi-cyclone |
The plant’s buyers audit working conditions and environmental performance, and the boiler’s records are part of that audit. The plant logs fuel receipts, stack dust tests and ash disposal manifests. The multi-cyclone keeps dust below 100 mg/Nm3, which meets the local limit for this size.
Ash goes to a brick maker. The boiler produces about 150 kg of ash a day, and the plant has a covered ash bin with a manifest for each removal.
Installation took three weeks and commissioning five days. The boiler replaced an electric steam generator whose running cost had become the plant’s largest utility bill. The electric unit is kept as a standby for the annual boiler inspection.
Steam pressure holds at 0.75 MPa at the pressing header, and the steam tunnel reaches temperature faster than before. The plant’s fuel cost fell by about 60% against electricity, and its reported scope 1 emissions fell accordingly.
External links open the publisher’s website and are provided for background reading.
Usually, by a wide margin. In this plant the fuel cost fell about 60% against an electric steam generator, and the payback was under two years.
Up to about 25%. Above that the furnace temperature falls and the unit smokes; covered storage is essential in the monsoon.
Yes, with a cyclone or filter and a tall stack. Fuel deliveries and ash removal need a covered yard to avoid dust complaints.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.