1-20 t/h boiler equivalent
Boiler Economizer and Air Preheater
Finned tube economizers and tubular air preheaters for fire-tube, water-tube and thermal oil systems, with cold-end protection aga...
View detailsSoftener and deaerator package for boiler make-up, holding hardness below 0.03 mmol/L and oxygen below 0.05 mg/L.


Boiler feedwater carries two problems that cost money in different ways. Hardness salts precipitate as scale on the hottest metal, and dissolved oxygen attacks steel wherever the water is warm and the protective magnetite film is thin. A treatment package for a small or medium boiler plant therefore has two stages: a twin-tank softener that exchanges calcium and magnesium for sodium, and a thermal deaerator that strips oxygen and carbon dioxide by heating the water to saturation.
Typical raw water at 200-350 mg/L total hardness, expressed as calcium carbonate, is reduced to 0.03 mmol/L or less, which is the usual limit for shell boilers. The softener does not remove alkalinity, silica or total dissolved solids, so where make-up is high or the boiler pressure is above 2.5 MPa, reverse osmosis or demineralisation is added ahead of the softener.
Strong-acid cation resin in sodium form holds the calcium and magnesium until the bed is exhausted, then is regenerated with brine. Twin tanks alternate: one runs in service while the other regenerates or stands by, so treated water is available continuously. A 10 m³/h unit carries about 200 L of resin, runs 8-12 hours between regenerations on typical hardness, and uses roughly 16 kg of salt per regeneration at 5-8% brine concentration.
Salt consumption is the main running cost, and it scales with hardness removed, not with water volume. A plant using 12,000 m³ of make-up a year at 250 mg/L hardness removes about 3 t of hardness salts and spends 3-4 t of salt doing it. Reducing hardness at the raw water source, or returning more condensate, cuts that bill directly.
Testing is the only way to know the bed is working. Hardness is titrated daily at the softener outlet and again at the feedwater pump; a rise from 0.01 to 0.05 mmol/L means the regeneration is incomplete, the brine is weak, or the resin is fouled with iron. Conductivity and chloride checks catch the other failure mode, exhaustion passing through as a hardness spike after a short service run.
The deaerator heats water to about 105 °C at slight positive pressure, which drops oxygen solubility to the point where 0.05 mg/L or less remains; a scrubber section and vent remove the released gas. The vessel is usually mounted at a height that gives the feed pump its net positive suction head, so the deaerator selection is tied to the boiler house layout, not just the flow rate.
Residual oxygen is mopped up chemically, normally with sodium sulphite at about 8 mg/L per mg/L of oxygen, and pH is held at 10-12 with trisodium phosphate or a proprietary blend. Those chemicals do not replace softening; they handle the last few percent that mechanical deaeration cannot reach. Blowdown control follows the chloride or conductivity limit, with continuous surface blowdown at 3-5% and periodic bottom blowdown for sludge.
Scale is a refractory layer with a thermal conductivity a fraction of steel’s. One millimetre on a fire-tube raises the metal temperature by tens of degrees and costs about 5% in fuel; 3 mm costs 12-15% and starts to threaten the tube plate. For a 10 t/h coal boiler burning 11,000 t of coal a year, 5% is 550 t of coal, or roughly RMB 385,000 at RMB 700/t delivered. The softener that prevents it costs a fraction of that in salt and resin.
The same arithmetic applies on the water side of a hot water boiler, where scale shows up as reduced output and higher return temperature rather than as a fuel meter movement. Scale also hides corrosion: underneath the deposit, oxygen pitting proceeds unnoticed until a tube fails.
| Item | 2 m³/h | 5 m³/h | 10 m³/h | 20 m³/h | 50 m³/h |
|---|---|---|---|---|---|
| Resin volume | 40 L | 100 L | 200 L | 400 L | 1,000 L |
| Vessel diameter | DN500 | DN600 | DN800 | DN1000 | DN1400 |
| Salt per regeneration | 4 kg | 8 kg | 16 kg | 32 kg | 75 kg |
| Outlet hardness | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L |
| Matched deaerator | 5 t/h | 10 t/h | 20 t/h | 35 t/h | 75 t/h |
| Dissolved oxygen | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L |
Size the softener on peak make-up plus regeneration water, not on average demand, and size the deaerator on total feedwater including condensate return. Send the raw water analysis with the enquiry; hardness, alkalinity, iron, chloride and silica decide whether softening alone is enough.
Only when make-up is high, the raw water is brackish, or the boiler runs above 2.5 MPa. Softening removes hardness but leaves dissolved solids and alkalinity, which set the blowdown rate and can cause foaming or carryover.
It scales with hardness removed. A 10 m³/h unit on 250 mg/L water uses about 16 kg per regeneration at 8-12 hour intervals, roughly 3-4 t of salt a year for 12,000 m³ of make-up.
About 5% of fuel, because the deposit insulates the tube and raises metal temperature. On a 10 t/h coal boiler burning 11,000 t a year that is 550 t of coal, far more than the salt and resin the softener consumes.
| Rated output | 2 m³/h | 5 m³/h | 10 m³/h | 20 m³/h | 50 m³/h |
|---|---|---|---|---|---|
| Resin volume | 40 L | 100 L | 200 L | 400 L | 1,000 L |
| Vessel diameter | DN500 | DN600 | DN800 | DN1000 | DN1400 |
| Salt per regeneration | 4 kg | 8 kg | 16 kg | 32 kg | 75 kg |
| Outlet hardness | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L | ≤0.03 mmol/L |
| Matched deaerator | 5 t/h | 10 t/h | 20 t/h | 35 t/h | 75 t/h |
| Dissolved oxygen | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L | ≤0.05 mg/L |
External links open the publisher’s website and are provided for background reading.
Include the capacity (t/h or MW), fuel, working pressure and site country so the proposal matches your permit limits.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.