Blowdown is the controlled removal of boiler water to limit dissolved solids and suspended matter. It is essential for safe, efficient operation, but every kilogram of blowdown water carries valuable heat. This article explains how to set cycles of concentration using TDS, compares automatic and manual blowdown, and outlines heat recovery options. With the right control, you can minimise blowdown rate and energy loss while protecting your boiler.
Setting Cycles of Concentration from TDS
Cycles of concentration (CoC) is the ratio of dissolved solids in the boiler water to those in the make-up water. It is typically limited by the most restrictive parameter: TDS, alkalinity, silica, or chloride. For a given make-up TDS, the maximum cycles are:
CoCmax = TDSlimit / TDSmake-up
For example, if the boiler water TDS limit is 3500 ppm and make-up TDS is 500 ppm, CoCmax = 7. However, other constraints may reduce this. The table below shows typical limits for fire-tube and water-tube boilers, based on common water-tube boiler standards (e.g., ASME). Always verify with your water treatment specialist and boiler manufacturer.
| Parameter | Fire-tube boiler (≤ 20 bar) | Water-tube boiler (40–60 bar) | Units |
|---|---|---|---|
| TDS (max) | 3500 | 2500 | ppm |
| Alkalinity (max) | 700 | 500 | ppm as CaCO3 |
| Silica (max) | 150 | 50 | ppm as SiO2 |
| Chloride (max) | 500 | 300 | ppm as Cl– |
Assumptions: Natural circulation, softened make-up, operating pressure within stated range. Limits vary with pressure and boiler design; consult your OEM.
To calculate blowdown rate as a percentage of steam output:
Blowdown % = (TDSmake-up / (TDSlimit – TDSmake-up)) × 100
Using the earlier example: (500 / (3500 – 500)) × 100 = 16.7%. This means 16.7 kg of blowdown per 100 kg of steam. At higher cycles, blowdown percentage falls, saving energy and water.
Automatic vs Manual Blowdown
Manual blowdown relies on an operator opening a valve at set intervals. It is simple and low-cost but prone to error: too little blowdown risks carryover and scaling; too much wastes energy. Automatic blowdown uses a conductivity or TDS sensor to modulate a control valve, maintaining the setpoint continuously. The table below compares typical performance.
| Aspect | Manual blowdown | Automatic blowdown |
|---|---|---|
| Typical TDS variation | ±20–30% of setpoint | ±5–10% of setpoint |
| Operator time | Daily checks | Weekly checks |
| Energy saving potential | Baseline | 2–5% of blowdown energy |
| Capital cost | Low | Moderate |
Assumptions: Continuous blowdown system, conductivity sensor calibrated monthly. Savings depend on load profile and make-up quality.
Automatic systems are particularly beneficial where load fluctuates or make-up quality varies. They also reduce the risk of over-blowing, which is a common energy drain. For boilers with high make-up TDS or variable steam demand, automatic control often pays back in 1–2 years through energy and water savings.
Heat Loss from Blowdown
Blowdown water leaves the boiler at saturation temperature. The heat lost can be significant. For a boiler at 10 bar (saturation temperature ~184°C), each kilogram of blowdown carries about 780 kJ of sensible heat relative to 20°C make-up. If blowdown rate is 5% of steam output for a 10 t/h boiler, that is 500 kg/h of blowdown, equivalent to 390,000 kJ/h or about 108 kW of heat. Over 8000 hours, this is 864 GJ per year. At a fuel cost of, say, $10/GJ, the annual cost is $8,640—often overlooked.
Reducing blowdown by increasing cycles from 5 to 8 can cut blowdown rate from 25% to 14.3% (for make-up TDS 500 ppm, limit 3500 ppm), saving over 40% of blowdown heat. However, this must be balanced against scaling risk.
Heat Recovery from Blowdown
Heat recovery from blowdown typically uses a flash tank or a heat exchanger. A flash tank recovers low-pressure steam that can be used in a deaerator, while a heat exchanger preheats make-up water. The table below shows typical recovery efficiencies.
| Method | Recovery efficiency | Typical application |
|---|---|---|
| Flash tank | 10–20% of blowdown heat | Boilers > 5 t/h |
| Heat exchanger | 50–80% of blowdown heat | All sizes, especially with continuous blowdown |
Assumptions: Flash tank operates at 0.5–1 bar; heat exchanger approach temperature 10–20°C. Actual recovery depends on blowdown rate and temperature.
Heat recovery not only saves energy but also reduces the temperature of blowdown discharge, easing environmental compliance. For boilers with high blowdown rates, a heat exchanger is often the most cost-effective solution. The payback depends on fuel cost, operating hours, and blowdown rate—typically 1–3 years.
Checklist for Blowdown Optimisation
- Test make-up and boiler water TDS, alkalinity, silica, and chloride at least weekly.
- Calculate maximum cycles of concentration from the most restrictive parameter.
- Set automatic blowdown controller to maintain TDS at 80–90% of limit.
- Calibrate conductivity sensor monthly and clean probe quarterly.
- Inspect and clean blowdown valve and orifice annually.
- Evaluate heat recovery feasibility if blowdown rate exceeds 5% of steam output.
- Record blowdown rate and energy use to track savings.
What to send us for a proposal
To recommend a blowdown control and heat recovery solution, we need:
- Boiler type, capacity (t/h), and operating pressure (bar).
- Make-up water analysis (TDS, alkalinity, silica, chloride, hardness).
- Current blowdown method (manual/automatic) and rate (% of steam output).
- Steam demand profile and annual operating hours.
- Fuel type and cost (per GJ or per unit).
- Space constraints and any existing heat recovery equipment.
With this data, we can size automatic blowdown systems and heat exchangers, and estimate energy savings. Explore our product range for blowdown valves and heat recovery units, or refer to our capacity and cost guide for budgeting guidance. Costs are driven by boiler size, control complexity, and heat exchanger surface area—not by arbitrary pricing.