Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China
Project case

5 t/h Gas Steam Boiler for a Textile Dyeing Plant in Casablanca, Morocco

A 5 t/h gas steam boiler supplies dyeing and finishing steam in Casablanca, with a heat-recovery economizer and a feedwater plant sized for the city's hard water.

5 t/h Gas Steam Boiler for a Textile Dyeing Plant in Casablanca, Morocco – Yuanda Boiler
Place
Casablanca, Morocco
Industry
Textile dyeing
Equipment
1 x 5 t/h WNS gas steam boiler
Year
2025

Dyeing on hard water

The plant in Casablanca dyes and finishes cotton and viscose for the domestic and European markets. It runs ten dyeing machines and a stenter, and steam demand is 3-3.8 t/h with a 4.5 t/h peak. The boiler is a 5 t/h WNS fire-tube unit at 1.25 MPa.

Casablanca’s water is hard – around 4-5 mmol/L – and the plant’s old boiler had a scale problem that showed up as a rising stack temperature every summer. The new installation has a duplex softener sized for 7 m3/h, a deaerator at 105 °C and automatic conductivity blowdown.

Boiler and economizer

At 5 t/h and 1.25 MPa the boiler absorbs about 3.5 MW. On natural gas at 35 MJ/Nm3 and 94% efficiency, full-load gas use is about 360 Nm3/h. The economizer is a finned-tube unit that takes the flue gas from 210 to 135 °C, and the plant cleans it every six months with compressed air and a water wash.

Boiler data
Item Value
Rated evaporation 5 t/h
Pressure 1.25 MPa
Average / peak load 3.0-3.8 / 4.5 t/h
Full-load gas rate about 360 Nm3/h
Feedwater hardness below 0.03 mmol/L
Efficiency about 94%

The dye-house peak

Ten dyeing machines heating at once can take 4.5 t/h for 20 minutes. The boiler’s 5 t/h rating covers that, and the plant staggers the machine starts by 10 minutes to keep the peak inside the boiler’s capacity. A 4 m3 feedwater tank at 105 °C provides a small buffer.

Steam pressure at the dye-house header is held at 1.15-1.25 MPa. The plant’s main control issue was the pressure-reducing station, which was oversized and hunted at low flow; a smaller pilot-operated valve fixed it.

Commissioning and results

Installation took four weeks and commissioning seven days. The softener was commissioned before the boiler, which the plant credits with the absence of scale in the first inspection. The boiler’s first annual opening showed clean tubes and no pitting.

Specific gas consumption is about 73 Nm3 per tonne of steam, and the plant has cut its blowdown rate from 8% to 4% by improving the feedwater. The dye house now holds temperature through the peak without the pressure dip that used to cause rework.

Frequently asked questions

Why is hard water such a problem in a fire-tube boiler?

Scale on the furnace tube raises metal temperature and can cause failure. Casablanca water at 4-5 mmol/L needs softening before it reaches the boiler.

How is the dye-house peak managed?

The boiler is sized on the simultaneous-heating case, and machine starts are staggered by 10 minutes so the peak stays within 4.5 t/h.

What does the economizer save?

About 5-6% of fuel by taking the stack from 210 C to 135 C. The exact figure depends on load and how clean the fins are.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote