View detailsA 5 t/h gas steam boiler supplies dyeing and finishing steam in Casablanca, with a heat-recovery economizer and a feedwater plant sized for the city's hard water.

The plant in Casablanca dyes and finishes cotton and viscose for the domestic and European markets. It runs ten dyeing machines and a stenter, and steam demand is 3-3.8 t/h with a 4.5 t/h peak. The boiler is a 5 t/h WNS fire-tube unit at 1.25 MPa.
Casablanca’s water is hard – around 4-5 mmol/L – and the plant’s old boiler had a scale problem that showed up as a rising stack temperature every summer. The new installation has a duplex softener sized for 7 m3/h, a deaerator at 105 °C and automatic conductivity blowdown.
At 5 t/h and 1.25 MPa the boiler absorbs about 3.5 MW. On natural gas at 35 MJ/Nm3 and 94% efficiency, full-load gas use is about 360 Nm3/h. The economizer is a finned-tube unit that takes the flue gas from 210 to 135 °C, and the plant cleans it every six months with compressed air and a water wash.
| Item | Value |
|---|---|
| Rated evaporation | 5 t/h |
| Pressure | 1.25 MPa |
| Average / peak load | 3.0-3.8 / 4.5 t/h |
| Full-load gas rate | about 360 Nm3/h |
| Feedwater hardness | below 0.03 mmol/L |
| Efficiency | about 94% |
Ten dyeing machines heating at once can take 4.5 t/h for 20 minutes. The boiler’s 5 t/h rating covers that, and the plant staggers the machine starts by 10 minutes to keep the peak inside the boiler’s capacity. A 4 m3 feedwater tank at 105 °C provides a small buffer.
Steam pressure at the dye-house header is held at 1.15-1.25 MPa. The plant’s main control issue was the pressure-reducing station, which was oversized and hunted at low flow; a smaller pilot-operated valve fixed it.
Installation took four weeks and commissioning seven days. The softener was commissioned before the boiler, which the plant credits with the absence of scale in the first inspection. The boiler’s first annual opening showed clean tubes and no pitting.
Specific gas consumption is about 73 Nm3 per tonne of steam, and the plant has cut its blowdown rate from 8% to 4% by improving the feedwater. The dye house now holds temperature through the peak without the pressure dip that used to cause rework.
External links open the publisher’s website and are provided for background reading.
Scale on the furnace tube raises metal temperature and can cause failure. Casablanca water at 4-5 mmol/L needs softening before it reaches the boiler.
The boiler is sized on the simultaneous-heating case, and machine starts are staggered by 10 minutes so the peak stays within 4.5 t/h.
About 5-6% of fuel by taking the stack from 210 C to 135 C. The exact figure depends on load and how clean the fins are.