Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China
Project case

6 t/h Gas Steam Boiler for a Cotton Processing and Textile Plant in Shymkent

A 6 t/h gas steam boiler at 1.25 MPa supplies dyeing and finishing in Shymkent, with a low-NOx burner, economizer and a feedwater system sized for hard local water.

Methanol and Multi-Fuel Fired Boiler, 0.5-10 t/h – Yuanda Boiler
Place
Shymkent, Kazakhstan
Industry
Textile and cotton processing
Equipment
1 x 6 t/h WNS gas steam boiler
Year
2024

Hard water, steady steam

The plant processes cotton and finishes fabric in Shymkent, where the mains water is hard enough that scale, not fuel, is the main operating risk. Steam demand runs at 4-5 t/h for two shifts, with a 5.5 t/h peak when the dye house and the stenters overlap. The boiler is a 6 t/h WNS fire-tube unit at 1.25 MPa.

Feedwater is the part of this installation the plant notices most. A softener sized for 8 m3/h reduces hardness to under 0.03 mmol/L, and a thermal deaerator at 105 °C removes oxygen before the water reaches the boiler. Without the softener, a fire-tube boiler at this hardness would scale the furnace tube within a season.

The boiler and its limits

The WNS is a three-pass wet-back unit with a corrugated furnace. At 6 t/h and 1.25 MPa it absorbs about 4.2 MW; on natural gas at 35 MJ/Nm3 and 94% efficiency the full-load gas rate is roughly 460 Nm3/h. The burner is a low-NOx type with flue-gas recirculation, and the economizer takes the stack down to about 140 °C.

Boiler data
Item Value
Rated evaporation 6 t/h
Pressure / temperature 1.25 MPa / 194 °C
Absorbed duty about 4.2 MW
Full-load gas rate about 460 Nm3/h
Feedwater hardness below 0.03 mmol/L
Blowdown automatic, on conductivity

What the winter changed

Shymkent is milder than northern Kazakhstan but still sees -10 to -15 °C, and the boiler house was originally unheated. The plant added a small space-heating circuit off the boiler and insulated the feedwater tank and the deaerator, which cut standby losses and stopped the economizer from freezing during weekend shutdowns. The gas train is indoors and trace-heated where it runs outside.

The burner was set up on the local gas analysis, which is leaner than the methane figure used for the initial selection. The commissioning engineer re-set the combustion curve on site with a flue-gas analyser, and the plant now checks O2 and CO monthly rather than annually.

Operating results

The boiler has run two seasons without a tube failure. Steam pressure holds within 0.05 MPa at the dye-house header, and the plant’s specific gas consumption is about 76 Nm3 per tonne of steam, against 82 before the economizer was commissioned. The softener resin is the maintenance item: it is regenerated daily and replaced every three years.

Frequently asked questions

Why is water hardness critical in a fire-tube boiler?

Scale on the furnace tube raises metal temperature and can cause a tube failure. At 1.25 MPa the limit is usually 0.03 mmol/L hardness or lower.

What is the gas consumption per tonne of steam?

About 76 Nm3 per tonne at 94% efficiency and 35 MJ/Nm3 gas, including the economizer.

Can the boiler run on LPG?

Yes, with a different gas train and burner orifice. The combustion curve has to be re-set because the Wobbe index differs.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote