The heat that leaves through the stack

Every boiler sends heat up the chimney, and the quantity is easy to estimate. At 240 °C stack temperature with 25 °C ambient, roughly 9-11% of the fuel energy leaves in the flue gas. An economiser transfers part of that to the feedwater, and every 20 K of stack temperature removed is worth 0.8-1% of fuel. That is why economisers pay back faster than almost any other boiler retrofit, and why a boiler without one is leaving money in the stack every hour it runs.

The calculation is not difficult, but three constraints decide whether the saving is real: the acid dew point, the feedwater temperature, and the back pressure the fan can tolerate. A proposal that ignores any of them will produce a payback figure that never materialises.

Recovered heat, step by step

Start with the flue gas mass flow. For natural gas, each Nm³ of fuel produces about 11.3 Nm³ of flue gas at 10% excess air, with a density near 1.25 kg/Nm³. A 6 t/h boiler at rating burns about 480 Nm³/h of gas, so the flue mass is 480 times 11.3 times 1.25, or 6,780 kg/h.

Then apply the temperature drop. With a specific heat of 1.05 kJ/kg·K, cooling the gas from 240 °C to 140 °C recovers 6,780 times 1.05 times 100, or 712 MJ/h, which is 198 kW. At 95% boiler efficiency, that heat replaces 712 divided by (35.59 times 0.95), or 21 Nm³/h of gas.

Then apply the operating hours honestly. A plant that runs 4,000 hours a year at an average of 80% load does not save 21 Nm³/h for 4,000 hours; it saves about 17 Nm³/h average for 4,000 hours, or 67,000 Nm³. At RMB 3.20 per Nm³, that is RMB 215,000 a year.

An installed economiser for a 6 t/h boiler, including the bypass, the feedwater piping modification and the stack work, is typically RMB 140,000-250,000 depending on how far the gas is cooled. At the figures above, payback is nine to eleven months. Ask for a quotation for the actual unit; the range is given only to show the order of magnitude.

Stack out Recovered Gas saved Annual saving Installed cost Payback
180 °C 119 kW 17.6 Nm³/h RMB 180,000 RMB 140,000 9.3 months
140 °C 198 kW 21.1 Nm³/h RMB 216,000 RMB 175,000 9.7 months
110 °C 257 kW 27.4 Nm³/h RMB 281,000 RMB 230,000 9.8 months
95 °C 287 kW 30.6 Nm³/h RMB 313,000 RMB 275,000 10.5 months

Read the last two columns together. Cooling to 140 °C recovers 69% of the heat available between 240 °C and ambient, and pays back in under ten months. Going on to 95 °C recovers another 45%, but the mean temperature difference between gas and water shrinks as the gas cools, so each additional kelvin needs disproportionately more surface. Installed cost rises faster than the saving and payback stops improving. That is why the economic optimum for a gas boiler is normally a stack temperature of 110-140 °C, not the lowest temperature the metallurgy allows.

The cold-end limit

Flue gas contains water vapour and, if the fuel contains sulphur, sulphur trioxide. The acid dew point of gas firing is around 55-60 °C; for oil firing with 1% sulphur it is 130-150 °C; for coal it can exceed 150 °C. If the metal surface falls below the dew point, acid condenses, and the economiser tubes fail from the outside in within two or three seasons.

That sets the minimum feedwater inlet temperature. With gas firing, feedwater at 60 °C entering an economiser and leaving at 110 °C keeps the tube wall above 60 °C at the cold end, which is safe. With oil firing, the feedwater must enter above about 130 °C, which usually means the economiser sits after the deaerator rather than before it, and the recoverable heat is much smaller.

If the plant wants to go below the dew point deliberately, it needs a condensing economiser with corrosion-resistant tubes, a condensate drain and a neutralisation arrangement. That is a different product from a standard finned-tube economiser and should be priced as such.

Feedwater temperature and system effects

An economiser can only heat the feedwater to below the saturation temperature at the boiler pressure, and in practice to 20-30 K below it, so that it does not boil in the tubes. At 1.25 MPa the saturation temperature is 190 °C, so an outlet of 150 °C is possible, but the flue gas is the real limit: with a 140 °C stack, the water cannot leave hotter than about 130 °C.

Where the plant already has a deaerator at 105 °C, the economiser is usually placed before it, heating make-up and return from 60 °C to 95 °C, and the deaerator takes it to 105 °C. That arrangement protects the deaerator’s steam demand and keeps the economiser’s cold end warm enough.

There is also a boiler-side effect that proposals often miss. Hotter feedwater means less heat is needed per kilogram of steam, so the boiler’s actual evaporation rises at the same firing rate. A 6 t/h boiler at 20 °C feed becomes a 6.7 t/h boiler at 100 °C feed. That is not extra capacity the plant can sell, but it does mean the burner will spend more time at part load, where efficiency is lower, and the net saving is slightly less than the stack calculation implies.

Installation constraints worth checking first

Space is the first. An economiser for a 6 t/h boiler is roughly 1.5 m long and 1 m square, and it has to sit between the boiler outlet and the stack, with room for a bypass damper and a drain. Retrofits into a tight boiler house sometimes need the stack moved, which changes the economics entirely.

Fan capacity is the second. The economiser adds 300-600 Pa of resistance; check the induced-draft fan curve at the actual gas volume, not at the catalogue rating. If the fan is already near the end of its curve, the retrofit needs a new impeller or a variable-speed drive, and that cost belongs in the payback.

Water-side fouling is the third. Finned tubes foul on the gas side if the boiler burns oil or biomass, and cleaning access decides the maintenance cost. Soot blowers or removable panels are worth specifying at the outset; an economiser that cannot be cleaned loses its saving within two years.

Monitoring the saving after installation

Fit a flue gas temperature sensor before and after the economiser, and log it with the gas meter. Within a month the plant can see whether the temperature drop matches the design, and whether the cold end is drifting. A rise in the outlet gas temperature at constant load means fouling; a fall in the water-side temperature rise means bypass leakage or scaling.

The payback calculation is a prediction. The log is the evidence. A plant that measures the saving can also claim it in an energy management report, which is often worth more internally than the gas itself.