Textile dyeing and finishing is one of the most uneven steam users in light industry. A single jet dyeing machine can pull 1.5–3 t/h during heat-up, then drop to a fraction of that during the hold and rinse phases. Stenters, by contrast, run close to a flat load for the whole shift. Add sizing, condensate return quality and the fact that several dye lots often start together after a shift change, and the result is a load profile with a high peak-to-average ratio. Sizing a boiler on average demand alone is the most common mistake we see; sizing it on the true coincident peak, with a condensate strategy that actually works, is what keeps pressure stable. This article sets out the numbers behind that profile and what to measure before specifying a boiler. For the equipment side, see our product range.
Batch dyeing: where the peaks come from
In exhaust dyeing, the dominant steam demand is heating the dyebath and the goods. A useful rule of thumb: heating water from 20 °C to 130 °C takes about 460 kJ/kg, and a typical liquor ratio of 1:8 means roughly 8 kg of water per kg of fabric. For a 500 kg machine that is about 4,000 kg of liquor, or around 1.84 GJ per heat-up. Spread over a 45-minute ramp, that is an average of about 680 kW, or roughly 1.1 t/h of saturated steam at 6 bar g (assuming ~2,050 kJ/kg useful enthalpy and 90% heat exchanger efficiency). Larger machines and faster ramps push this to 2–3 t/h each.
The critical issue is coincidence. If six machines of this size start heat-up within the same 15 minutes, the plant sees a step of 6–7 t/h above its holding load. Pressure in the header sags, ramp times stretch, and dye cycles drift. Practical mitigations include staggered start schedules, buffer hot-water storage, and a boiler selected for the coincident peak rather than the daily average. Our capacity and cost guide explains how to translate these peaks into a boiler rating.
Stenters and continuous finishing: the steady base load
Stenters, sanforizers, mercerizers and cylinder dryers form the flat part of the profile. A stenter’s heat demand is driven by evaporation: drying roughly 1 kg of water from fabric requires about 2,600–2,900 kJ including sensible heat and air losses. A stenter evaporating 400 kg/h of water therefore needs around 1.1–1.2 GJ/h, or about 0.55–0.6 t/h of steam at 6 bar g, before housing and exhaust losses. In practice, 6- to 10-chamber stenters commonly draw 0.8–1.8 t/h each, depending on fabric weight, wet pick-up and exhaust settings.
Because stenters run continuously, they set the minimum boiler load and the turndown requirement. A boiler that cannot modulate down to roughly 20–25% of rated output will cycle, with efficiency and emissions penalties. This is why the ratio between stenter base load and dyeing peaks matters as much as the peak itself.
Condensate quality: the hidden load multiplier
Condensate return is where many dyehouses lose the energy they paid for. Dyeing machines often return condensate contaminated with dye, caustic or sizing residues; if conductivity or colour exceeds the boiler feed limits, it is dumped to drain. Every tonne of condensate lost at 90 °C represents roughly 0.3 GJ of sensible heat, plus the cost of treating and heating make-up water from 15 °C. Returning 80% instead of 40% of condensate can cut fuel demand by several percent and reduce water treatment chemical use.
Separation matters: keep clean stenter and heat-exchanger condensate on a dedicated return line, and route potentially contaminated dyehouse condensate through sampling and, where needed, a separate return or drain path. Flash steam from high-pressure traps should be recovered to a low-pressure main rather than vented.
Indicative load profile
The table below shows a representative profile for a mid-sized dyehouse with six jet machines (500 kg), two stenters and a sizing range. Values are indicative engineering estimates, not measurements from a specific plant; assumptions are stated.
| Load element | Typical demand (t/h) | Duration / pattern | Assumptions |
|---|---|---|---|
| Jet dyeing heat-up (per machine) | 1.1–2.5 | 30–60 min ramp | 500 kg batch, 1:8 liquor ratio, 20→130 °C, 90% HX efficiency |
| Dyeing hold and rinse (per machine) | 0.2–0.5 | 2–4 h | Temperature maintenance and rinse water heating |
| Stenter (per unit) | 0.8–1.8 | Continuous, 16 h/day | 400–800 kg/h evaporation, 6 bar g steam |
| Sizing range | 0.6–1.2 | Batch, 8 h/day | Cylinder drying of sized warp |
| Coincident plant peak | 8–12 | 15–30 min windows | 4–6 dye machines ramping together plus base load |
| Night / low-shift base | 1.5–3 | 8 h | Stenters only, reduced dyehouse activity |
Note the peak-to-average ratio: a plant averaging 4 t/h can peak at 10–12 t/h. Boiler selection, feedwater capacity and deaerator sizing must all follow the peak, while turndown must handle the night base.
Checklist before you size anything
- Log steam flow at 1-minute intervals for at least two weeks, including shift changes and week starts.
- Record pressure at the boiler outlet and at the furthest dyeing machine; a 0.5 bar sag during ramps signals undersized distribution.
- List every dyeing machine with volume, liquor ratio, ramp rate and typical batch size.
- Measure condensate return flow and temperature, and test conductivity and colour at the return tank.
- Separate clean and contaminated condensate lines and quantify each stream.
- Check stenter exhaust humidity and wet pick-up; over-drying is wasted steam.
- Confirm boiler turndown and minimum stable load against the night base.
- Review trap performance; failed traps show up as low return temperature and flash losses.
What drives cost
Cost in a project like this is driven mainly by peak steam rate, operating pressure, fuel type, feedwater quality and the extent of condensate recovery and heat recovery specified. A higher peak with wide turndown needs a larger, more controllable boiler and bigger feedwater and deaerator capacity; contaminated condensate may require separation, sampling and treatment equipment. Layout, stack height, and the distance from the boiler house to the dyehouse also affect piping and insulation scope. We do not quote figures here because the range is too wide to be meaningful without your load data.
What to send us for a proposal
To size a boiler and steam system properly, send us: a 1-minute steam flow log (or the best available trend data) covering at least two weeks; a machine list with volumes, liquor ratios and ramp rates; stenter evaporation rates and operating hours; measured condensate return flow, temperature and quality; required steam pressure at the machines; fuel type and available supply pressure; and a site layout sketch showing the boiler house and main users. With those inputs we can model the coincident peak, propose a boiler rating and turndown, and outline the condensate and heat recovery scope. Start with our product range and the capacity and cost guide, then send your data for a specific proposal.