120-5,800 kW
YY(Q)W Gas/Oil Thermal Oil Heater, to 340 C
Horizontal liquid-phase thermal oil heater, 120-5,800 kW, disc coil heating surface, 300-340 C at 0.8-1.0 MPa working pressure.
View detailsClosed-loop pressurized hot water boiler for 95/70 and 115/70 systems, 0.35-14 MW, three-pass wet-back shell with modulating burner.



A pressurized hot water boiler is the same shell as a steam boiler with the steam drum replaced by a closed water circuit. Water returns at 70 °C, passes the furnace and the two convective bundles, and leaves at 95 or 115 °C. The system is sealed: expansion is taken by a diaphragm vessel or a nitrogen-pressurized tank, and a safety valve protects the shell. There is no open expansion tank at the top of the building, no water surface in contact with air, and therefore no continuous oxygen ingress into the circuit.
That last point is the quiet advantage. An atmospheric system absorbs oxygen through its tank every hour of every day, and the corrosion products end up as sludge in the boiler and as pinholes in the pipework. A sealed loop, correctly filled and dosed once, carries the same water for years.
Water at atmospheric pressure boils at 100 °C, so a 115 °C flow temperature is impossible in an open system: the water would flash in the boiler and the pump would cavitate. Raising the pressure raises the boiling point — about 120 °C at 0.1 MPa gauge, 170 °C at 0.7 MPa — and 1.25 MPa gives a margin wide enough that the 115 °C outlet is nowhere near saturation. The pressure is a means of holding the water liquid, not a process requirement.
The higher the design pressure, the thicker the shell and the more expensive the unit. That is why 95/70 systems are built at 0.7 MPa and 115/70 systems at 1.0-1.25 MPa rather than everything at the maximum.
Gas burns in a corrugated furnace set low and symmetrically in the shell, turns in a water-backed reversal chamber, crosses the second-pass bundle and returns through the third, leaving at 150-165 °C before any economiser. The symmetric low furnace position keeps the shell temperature even around its circumference, which matters on a vessel that sees 14 MW in a 7.9 m long body.
All tube-to-tubesheet joints are welded, not expanded, so the boiler tolerates the thermal cycling of a heating load without weeping at the tube seats. The front smoke box is quick-opening, the rear chamber carries a combined explosion door and inspection opening, and the underside of the shell has two handholes and an ash door for cleaning. Those details decide how pleasant the annual service is.
The expansion vessel is sized on the system water volume, the maximum temperature swing and the static height, with the pre-charge set cold. Undersized, it lets the safety valve lift on every warm-up, which is both a nuisance and a slow loss of treated water. The safety valve must be piped to a safe discharge, and the boiler should have a low-pressure cut-out as well as a high-limit: a circulating pump trip with the burner still firing is the classic way to boil a small water volume in a hurry.
Control is by outdoor-reset or flow-temperature modulation, with burner interlock on high limit, low flow and flame failure. Where the loop serves a district network, a weather-compensated curve on the flow temperature and a return-temperature sensor give most of the seasonal savings for very little cost.
Choose pressurized when the design flow temperature exceeds 100 °C, when the building is tall enough that the static head exceeds what an open tank can be placed at, when the system must exclude oxygen, or when the plant room has no space at the top of the circuit for a tank. Choose atmospheric where 85/65 or 95/70 is enough and the simpler, cheaper shell is preferred.
Efficiency depends on the return temperature and the fuel. Gas firing allows a stack around 150 °C and an economiser that lifts efficiency to the mid-nineties. Heavy oil raises the acid dew point, so the return must be held above 60 °C and the stack above 150 °C; below that the last pass corrodes from the gas side. A three-way valve on the return, set to blend until the loop warms, is the standard protection and costs very little compared with a replacement bundle.
Atmospheric water boils at 100 °C, so 115/70 is impossible and any sealed circuit needs a pressure rating. Atmospheric units are cheaper and simpler where 85/65 or 95/70 is enough and a tank can be sited at the top of the system.
Roughly 5-10% of system water volume for the temperature swing, plus the water needed to fill the static height, with the pre-charge set cold. The figure should be calculated from the actual pipework volume, not estimated from boiler output.
The shell will accept it, but efficiency and dew-point behaviour then depend on the flue-gas path. For sustained low return temperatures a condensing build with a corrosion-resistant tail is the correct selection.
| Model | WNS0.7-0.7/95/70-Q | WNS1.4-0.7/95/70-Q | WNS2.8-1.0/95/70-Q | WNS4.2-1.0/95/70-Q | WNS7.0-1.0/95/70-Q | WNS10.5-1.25/115/70-Q | WNS14-1.25/115/70-Q |
|---|---|---|---|---|---|---|---|
| Rated heat output | 0.7 MW | 1.4 MW | 2.8 MW | 4.2 MW | 7.0 MW | 10.5 MW | 14 MW |
| Rated working pressure | 0.7 MPa | 0.7 MPa | 1.0 MPa | 1.0 MPa | 1.0 MPa | 1.25 MPa | 1.25 MPa |
| Outlet / return temperature | 95/70 °C | 95/70 °C | 95/70 °C | 95/70 °C | 95/70 °C | 115/70 °C | 115/70 °C |
| Circulating water flow | 24 t/h | 48 t/h | 96 t/h | 144 t/h | 240 t/h | 360 t/h | 480 t/h |
| Heating surface (body) | 28.6 m² | 57.63 m² | 107.16 m² | 197.61 m² | 291.33 m² | 427.15 m² | 517.2 m² |
| Gas consumption (LNG) | 85.6 Nm³/h | 172.8 Nm³/h | 321.2 Nm³/h | 498 Nm³/h | 631.5 Nm³/h | 1094.5 Nm³/h | 1598.5 Nm³/h |
External links open the publisher’s website and are provided for background reading.
Include the capacity (t/h or MW), fuel, working pressure and site country so the proposal matches your permit limits.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.