4 t/h Coal Steam Boiler for a Mine and Processing Camp at Erdenet, Mongolia

A 4 t/h coal-fired steam boiler supplies heating and process steam at a mine camp near Erdenet, with a hardened feedwater system for the site's hard borehole water.

SZL Assembled Chain Grate Biomass Boiler, 4-20 t/h – Yuanda Boiler
Place
Erdenet, Mongolia
Industry
Mining and ore processing
Equipment
1 x 4 t/h DZL chain-grate coal steam boiler
Year
2025

A boiler that has to work without a water main

The mining camp near Erdenet is 40 km from the town and takes its water from boreholes with total hardness around 8 mmol/L and dissolved solids near 900 ppm. Steam is used for the ore-dressing building, the workshop and the camp’s heating through a calorifier, and the boiler has to do this at -30 °C with a maintenance team of three.

The unit is a 4 t/h DZL chain-grate coal boiler at 1.25 MPa, burning the same low-grade coal the mine produces. The design priority was not efficiency but robustness: a simple boiler, a generous water-treatment plant, and enough instrumentation that a non-specialist can see a problem before it becomes a failure.

Water treatment carries the reliability

At 8 mmol/L hardness, a softener alone would be regenerated twice a day. The plant uses a two-stage system: a lime-soda softener followed by a strong-acid cation exchanger, bringing hardness below 0.02 mmol/L. The boiler runs at 2,000 ppm TDS with automatic blowdown, and the feedwater is deaerated at 105 °C.

The camp stores 30 m3 of treated water and 10 t of salt, enough for two weeks without a delivery. That buffer matters in winter, when the road to Erdenet can close for days.

Site data
Item Value
Rated evaporation 4 t/h
Pressure 1.25 MPa
Raw water hardness about 8 mmol/L
Treated hardness below 0.02 mmol/L
Coal LHV about 15 MJ/kg
Design ambient -30 °C

Winter operating practice

The boiler house is a steel building with 150 mm insulation, and the feedwater tank sits inside it. The ash conveyor is enclosed, the coal store holds ten days of fuel, and the plant keeps the boiler warm on a low fire rather than shutting it down on weekends – a cold start at -30 °C is the most reliable way to crack a tube plate.

The burner is a fixed-grate coal stoker rather than a pulverised system, which suits the mine’s coal and the camp’s maintenance capability. Grate bars are replaced once a year as a planned job, and the refractory arch is patched every second season.

Results

The boiler has run two winters and supplies 3-3.5 t/h through the coldest months. The camp’s main complaint disappeared: the old boiler could not hold pressure when the ore-dressing building drew steam, and the new unit holds 1.2 MPa through the shift change. Coal consumption is about 700 kg/h at rating, and the ash goes back into the mine’s spoil heap.

Frequently asked questions

Why such a large water-treatment plant for a 4 t/h boiler?

Borehole water at 8 mmol/L hardness would scale the boiler within weeks. Two-stage softening is cheaper than tube replacement at a remote site.

Can the boiler burn the mine's own coal?

Yes, a chain-grate stoker handles the mine's 15 MJ/kg coal. The grate and ash system are sized for its ash content.

What happens if the road closes?

The camp stores ten days of coal, two weeks of salt and 30 m3 of treated water, so the boiler can run through a road closure without resupply.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote