View detailsA 2 t/h gas steam boiler supplies tunnel washers, ironers and a drying line at an industrial laundry in Dubai, sized on the morning wash peak.

An industrial laundry in Dubai processes hotel linen and restaurant textiles on two tunnel washers, four ironers and a tumble-dry line. Steam heats the wash water, the ironers and the drying coils. The plant runs 20 hours a day, and the load peaks between 06:00 and 10:00 when the hotels’ linen arrives and every machine starts at once.
The boiler is a 2 t/h WNS fire-tube unit at 0.8 MPa. The peak, not the average, sized it: the plant draws about 1.2 t/h through the day but touches 1.8 t/h in the morning.
Laundries return a lot of condensate, and this plant’s return rate is about 70%. The condensate comes back at 90-95 °C into a receiver with a level control and a flash vessel; the flash steam goes to the wash-water heater. Returning that heat is worth more than any burner adjustment, and the plant’s make-up is only 30% of steam output.
At 2 t/h and 0.8 MPa the boiler absorbs about 1.35 MW. With 70% condensate return at 95 °C, the fuel needed per tonne of steam is about 15% lower than with cold make-up.
| Item | Value |
|---|---|
| Rated evaporation | 2 t/h |
| Pressure | 0.8 MPa |
| Average / peak load | 1.2 / 1.8 t/h |
| Condensate return | about 70% |
| Feedwater | softened, deaerated |
| Fuel | natural gas |
Dubai’s water is desalinated and low in hardness, but the plant still softens make-up and tests it weekly. The boiler house is air-conditioned in summer, which protects the control panel and keeps the burner’s air intake cool; without it the panel’s variable-frequency drives overheated.
Steam quality matters for the ironers: wet steam causes spotting and slows the ironers. The boiler has a separator and the plant holds TDS at 2,000 ppm, with a daily bottom blowdown.
The boiler replaced two ageing vertical units that could not hold pressure in the morning peak. Installation took four weeks including the gas line and condensate receiver. The plant now holds 0.75 MPa through the peak, and the ironers run at full speed instead of cycling on low steam pressure.
Gas consumption per kilogram of linen fell by about 12%, split between the new boiler’s efficiency and the improved condensate return.
External links open the publisher’s website and are provided for background reading.
Returning 70% of condensate at 95 C cuts the fuel needed to heat make-up water, saving roughly 15% of gas compared with an all-cold-water plant.
Most flatwork ironers run at 0.5-0.7 MPa. The boiler at 0.8 MPa gives enough margin for distribution losses.
A separator, controlled TDS and a correctly sized steam space. Wet steam spots linen and slows the ironers.