View detailsTwo 3 t/h gas steam boilers supply cooking, drying and CIP steam at a seasoning plant in Lagos, with N+1 redundancy and a gas train rated for local supply pressure.

The seasoning plant in Lagos makes bouillon cubes and packaged spices, and its steam load is 2-2.5 t/h for cooking and drying, with a 2.8 t/h peak when the CIP set runs. Two 3 t/h WNS gas boilers at 1.0 MPa were installed so that one carries the load and the other stands ready, rather than a single 3 t/h unit running flat out.
The plant’s gas arrives at a lower pressure than the burner’s nominal requirement, so the gas train was sized for 15-25 kPa inlet with a booster fan downstream. That single detail decided the burner selection: a standard train would have tripped on low pressure every afternoon.
Each boiler absorbs about 2.1 MW at rating. On gas at 34 MJ/Nm3 and 93% efficiency the full-load rate is about 240 Nm3/h. The plant runs one boiler at 70-85% and rotates weekly, which keeps both units exercised and spreads maintenance.
| Item | Value |
|---|---|
| Installed capacity | 2 x 3 t/h |
| Pressure | 1.0 MPa |
| Average / peak load | 2.0-2.5 / 2.8 t/h |
| Gas inlet pressure | 15-25 kPa |
| Efficiency | about 93% |
| Feedwater | softened, deaerated |
The booster is a dry-running screw compressor with a pressure switch and a non-return valve, installed outdoors under a canopy. The burner management system proves gas pressure, air pressure and flame before each start, and the double-block-and-bleed train is leak-tested daily.
Nigeria’s gas composition varies by supplier, and the plant keeps a quarterly analysis on file. The burner was commissioned on the first analysis and re-trimmed once when the supplier changed; CO stayed under 25 ppm.
The plant’s borehole water is hard and high in iron. A softener plus an iron filter keeps hardness below 0.03 mmol/L, and the deaerator removes oxygen at 105 °C. Steam is used in jacketed kettles and a rotary dryer, so the plant holds TDS at 2,000 ppm and checks steam dryness at the header monthly.
The plant has run two years without a production stop for boiler reasons, including one period when a boiler was opened for its annual inspection. Gas consumption per tonne of product fell by 11% against the old single boiler, mostly because the plant can now run a unit at a reasonable firing rate instead of cycling a larger one.
External links open the publisher’s website and are provided for background reading.
Redundancy and part-load efficiency. One unit covers the load at 70-85% and the other is available for maintenance rotation or a peak.
The gas train is sized for 15-25 kPa with a booster fan, so the burner sees stable pressure even when the distribution network sags.
Daily, before first start. The double-block-and-bleed arrangement makes the test a two-minute procedure.