Start with people, not with tank size
A drinking-water boiler is usually bought the wrong way round. Somebody measures the canteen, counts the taps, picks a 100-litre unit because 100 litres sounds like enough, and discovers in the first week that the tank empties at the morning break and takes half an hour to recover. The correct starting point is the number of people who draw water in the same fifteen minutes, not the number of people on site over a shift.
Consumption figures are stable across sites. Drinking water runs at 1.5-2.5 litres per person per shift in a factory, higher in hot climates and in heavy work. Hot drinks account for 0.3-0.5 litres per person per break, and most people take one at each of two breaks. Cleaning and canteen use adds 10-15%. What sizes the unit is the break, because that is when 50-60% of the shift arrives within a quarter of an hour.
Peak draw and recovery arithmetic
Take a plant with 300 people per shift on three shifts. At a break, 55% take a hot drink at 0.4 litres, which is 66 litres drawn in about fifteen minutes. The unit holds 100 litres at 95 °C, so the draw is met from storage without the element having to keep up instantaneously. What matters next is how fast the tank returns to temperature before the next person arrives and before the next break.
The recovery time follows from the energy needed to raise the incoming water to storage temperature. Replacing 66 litres of 95 °C water with mains water at 15 °C requires 66 x 4.186 x 80 kilojoules, or 22.1 MJ, which is 6.1 kWh. A 60 kW element set delivers that in about six minutes of continuous running, and in practice eight to ten minutes once the draw is spread over the break and the thermostat cycles. A 30 kW unit takes twice as long, which is still acceptable for a fifteen-minute break but leaves nothing in reserve for the second half of it. An 18 kW unit takes twenty minutes and will run out of hot water on a busy morning.
The rule of thumb: match the element so that recovery of one break’s draw takes no more than half the interval between breaks, and size the storage so that one break’s draw is 50-70% of the tank. A tank that empties completely on every break runs cold at the end of it and takes twice as long to recover, because the incoming water has further to climb.
Element scale and water quality
The element is immersed in the water it heats, so everything dissolved in the water deposits on it. A 1 mm scale layer raises the element surface temperature by 80-120 K, cuts the heat output by 5-10%, and roughly halves element life. At a hardness of 250-400 mg/L as calcium carbonate — ordinary municipal water in much of northern China — a unit in daily use needs descaling every four to eight weeks. On softened water the interval stretches to six months.
There are three ways to deal with it. Feed the unit with softened or reverse-osmosis water, which is the only real solution and costs a small softener. Choose a design that allows the element to be withdrawn without dismantling the tank, so descaling is a maintenance task rather than a service call. Or accept the scale and replace elements annually, which is what most sites do and what most sites regret.
Stainless 304 or 316 for the tank and the element sheath is standard. A unit that stores water at 95 °C for years will show chloride stress corrosion at welds if the water is aggressive, so 316 is worth specifying on a coastal site or where the chloride level is above 100 mg/L.
Power supply and load management
Electric boiling water units are resistive loads and draw their full rating whenever the element is on. At 400 V three-phase, the current is about 1.44 A per kW: a 9 kW unit draws 13 A, a 45 kW unit 65 A, a 90 kW unit 130 A. Those are not large loads individually, but they are usually added to a distribution board that was sized before anybody thought about a 90 kW water boiler, and the cable, the breaker and the earth leakage protection all have to be right.
Two practical points. First, a 30 mA residual current device is required for socket-fed equipment and is good practice for a fixed unit in a wet area, but nuisance tripping on a large element with moisture ingress is common, so the enclosure, the gland and the element seal matter as much as the protection. Second, the unit should be on a circuit that can be shed or time-controlled, because a 90 kW boiler starting at 06:00 alongside the compressors and the air handling units can trip the site maximum demand. A time switch that holds the unit off until the shift starts, or a contactor interlock with the largest motor, costs almost nothing.
Storage temperature and hygiene
A boiling-water unit is not a steriliser, and it should not be sold as one. What it does is hold water at 93-96 °C, a temperature at which bacteria do not multiply, and deliver it hot enough to make a drink and to rinse equipment. Where the incoming water is not potable, boiling is a genuine disinfectant, but only if the water actually reaches a rolling boil and is not re-contaminated in a lukewarm tank afterward.
That is the argument for storing hot rather than warm. A tank held at 60-70 °C to save standing loss is in the range where thermophilic bacteria are comfortable. A tank at 93-96 °C is not. The cost is standing loss — a 100-litre unit at 95 °C loses 1-2 kWh a day through its insulation — which is trivial against the risk. Drain and descale on the same schedule, and fit a tamper-proof thermostat so nobody “adjusts” the setpoint down to save electricity.
| Rating | Storage | Typical draw per break | Recovery time | People served |
|---|---|---|---|---|
| 9 kW | 30 L | 20 L | 12 minutes | 40-60 |
| 18 kW | 50 L | 25 L | 8 minutes | 80-120 |
| 30 kW | 100 L | 50 L | 9 minutes | 150-200 |
| 45 kW | 150 L | 80 L | 10 minutes | 250-350 |
| 60 kW | 200 L | 100 L | 9 minutes | 350-450 |
| 90 kW | 300 L | 150 L | 9 minutes | 500-700 |
The selection sequence
Count the people on the largest shift, take 55% of them at 0.4 litres for the break draw, choose a tank where that draw is 50-70% of the volume, and size the element so recovery takes half the break interval. Then check the water hardness, the supply capacity and the space for element withdrawal. That is a ten-minute calculation, and it is the difference between a unit that is adequate for a decade and one that is replaced in two years.
Where the site has several buildings, two or three smaller units at the points of use usually beat one large unit and a distribution loop, because a loop of hot water at 95 °C loses more heat than the units consume standing by, and because a single unit is a single point of failure for the whole site.