Industrial laundries are steam-intensive by nature, but the load is rarely steady. A tunnel washer (continuous batch washer) draws steam in bursts as each compartment heats fresh water, flatwork ironers pull large volumes through their cylinders, and press or dryer sections add their own demand. The boiler is sized not on the average hourly figure but on the coincidence of these loads. This article sets out typical engineering values, the simultaneity question, and why condensate return matters as much as steam output. For equipment options see our product range; for sizing methodology see the capacity and cost guide.
Where the steam actually goes
In a typical tunnel laundry, the continuous batch washer dominates average consumption, but the ironer line dominates instantaneous demand. Tunnel washers heat process water to roughly 70–90 °C in the wash zones and use steam injection or shell-and-tube heat exchangers. A common rule of thumb is 0.25–0.45 kg of steam per kg of dry linen for the tunnel washer alone, depending on soil level, water temperature and whether heat recovery is fitted.
Flatwork ironers are different: a 3 m wide, 2-cylinder ironer running at 30 m/min can draw 300–500 kg/h of steam continuously while it is operating, because the cylinders must be held at 160–180 °C surface temperature. Chest ironers and presses add short, high peaks of 50–150 kg/h each. Dryers, if steam-heated, add a further 0.3–0.5 kg steam per kg of linen evaporated.
Peak simultaneity: the number that sizes the boiler
Adding nameplate figures gives an unrealistically large boiler. In practice, not every consumer runs at full load at the same moment. A simultaneity (diversity) factor of 0.7–0.9 is common for laundries with a tunnel washer and ironer line, but it must be justified by the shift pattern. If the ironer starts at the same time as the tunnel washer’s heat-up cycle, the factor approaches 1.0 for 15–30 minutes.
The table below gives indicative values for a mid-size laundry processing 1,500 kg/h of dry linen. Assumptions: saturated steam at 8 bar g, feedwater 20 °C, condensate returned at 80–90%, tunnel washer with heat recovery, two 3 m ironers.
| Consumer | Average steam (kg/h) | Peak steam (kg/h) | Notes |
|---|---|---|---|
| Tunnel washer, 12 compartments | 450 | 600 | Bursts during fill and heat-up |
| Flatwork ironer 1 (3 m) | 350 | 450 | Continuous while running |
| Flatwork ironer 2 (3 m) | 350 | 450 | May run in parallel |
| Presses / form finishers (4 units) | 120 | 300 | Short, overlapping peaks |
| Steam dryers (2 tumblers) | 200 | 250 | Depends on moisture retention |
| Space heating / hot water | 100 | 150 | Seasonal |
| Sum of peaks | 1,570 | 2,200 | Before diversity |
| Design load at 0.8 diversity | — | 1,760 | Boiler output, plus 10% margin |
Note that the average column sums to about 1,570 kg/h while the diversified peak is 1,760 kg/h — a boiler sized on average alone would be short by roughly 12% during simultaneous operation, enough to cause pressure droop and slow ironers.
Condensate: recover it or pay for it twice
Every kilogram of steam that condenses in the ironer or tunnel washer carries roughly 2.1 MJ of enthalpy at 8 bar g. Returning condensate at 80–90 °C instead of feeding cold make-up water saves both energy and water treatment cost. A laundry returning 85% condensate on a 1,760 kg/h load returns about 1,500 kg/h of hot water; the remaining 260 kg/h is make-up.
Practical points: ironer cylinders and tunnel washer heat exchangers should drain through steam traps sized for full condensate load, with flash steam recovered where possible. Condensate lines must be sized for two-phase flow — a common error is undersizing the return main, which causes backpressure and waterlogging. Check trap stations monthly; a failed-open trap on a 450 kg/h ironer can waste a significant share of boiler output.
Sizing and control implications
Because the ironer line is the steadiest large consumer, it is often worth giving it a dedicated boiler or a priority header. Modulating burners with a 1:4 or 1:5 turndown handle the swing between wash-only periods and full ironing better than on/off units. Where the tunnel washer has a large heat-up demand at shift start, a small steam accumulator or a sequenced start (washer first, ironers five minutes later) can shave the peak by 10–15%.
Boiler feedwater quality matters more than many operators expect: ironer cylinders and tunnel washer exchangers are sensitive to scale, and a softener plus deaerator is standard on loads above roughly 1,000 kg/h. The capacity and cost guide explains how these choices affect capital and running cost; our product range covers fire-tube and water-tube options for this load band.
Checklist before you size
- List every steam consumer with nameplate kg/h and operating hours per shift.
- Record actual peak steam flow with a meter for at least one full week, including shift starts.
- Confirm tunnel washer heat-up time and whether heat recovery is fitted.
- Measure condensate return percentage and temperature at the boiler feed tank.
- Check steam trap condition on ironers and heat exchangers.
- Note whether ironers and tunnel washer start simultaneously.
- Allow 10% margin on the diversified peak, not on the sum of nameplates.
What to send us for a proposal
To size a boiler accurately we need: a consumer list with nameplate steam rates and duty cycles; one week of metered steam flow if available; the tunnel washer model, compartment count and heat-up time; ironer width, cylinder count and operating speed; condensate return percentage and temperature; feedwater analysis; and the site’s fuel and electrical supply details. With those figures we can propose a boiler, feedwater package and trap strategy matched to your actual peak, and explain what drives the cost — boiler size, pressure rating, burner turndown, heat recovery and controls — without guesswork.