0.5-4 t/h
Mobile Trailer Steam Boiler Unit, 0.5-4 t/h
Trailer-mounted packaged steam boiler, 0.5-4 t/h at 1.0-1.25 MPa, with burner, feed pump, water tank, control panel and stack on o...
View detailsDual-output boiler supplying process steam and 60-95 °C hot water from one pressure part, with a separate protected water circuit and unified controls.



A plant that needs steam usually needs hot water as well: 60 to 95 °C water for washing, sanitation, domestic supply, preheating or heating. The conventional answer is two boilers, or a boiler and a heat exchanger. The combined unit puts both into one shell: the furnace raises steam in the upper part, and a separate tube bundle, in the water volume or the steam space, heats a closed circuit to 60-95 °C.
Ratings run from 0.5 to 4 t/h steam equivalent, with a water side of 0.35 to 2.8 MW. The split is a selection decision: the same shell can send 60 per cent of its heat to steam and 40 to water, or the reverse. It should follow the load duration curve rather than the nameplate peak, because a bundle sized for a peak that occurs twice a year is oversized for the other 8,000 hours.
The water circuit is a separate pressure boundary: its own design pressure, typically 0.6 MPa against 1.0-1.25 MPa on the steam side, its own safety valve, expansion vessel and pump. Because the boundaries are separate, steam pressure never appears on the water side. That is the whole safety argument, and it holds only if the bundle is a proper pressure part with its own relief, not a coil welded into the shell with the water side open to atmosphere.
The failure case is a bundle leak: steam at 1.25 MPa enters a 0.6 MPa circuit, pressure rises, the water-side valve lifts, and the water temperature climbs toward saturation. Protection is a high-temperature trip closing the steam admission valve plus a pressure switch stopping the burner, both independent of the normal controller. The expansion vessel takes 5 to 8 per cent of system volume, and the water-side safety valve is sized for the steam flow a failed bundle can pass, not for thermal expansion. Valves sized on expansion alone are why this arrangement has a poor reputation in some markets.
One PLC runs both duties. Steam pressure is the master signal: the burner follows steam demand, and the water side draws heat through its bundle, with a three-way valve or variable-speed pump holding the outlet at set point. When both peak together, steam wins and the water temperature drifts within about 5 K before an alarm. That priority must be written down, because two loops fighting for one burner produce cycling and short burner life.
Where the water load is small and intermittent, an external plate exchanger on the steam line is cheaper and removes the bundle, at 1 to 2 per cent of the heat and an extra pump. The in-shell bundle earns its place when the water load is large, continuous and space is tight.
A tonne of steam at 1.0 MPa carries about 2.7 GJ above 20 °C feedwater, so a 2 t/h unit is roughly a 1.5 MW boiler. If half goes to water at 70/50 °C, a 20 K drop, the flow is 0.75 MW divided by 4.186 kJ/kg·K times 20 K: about 9 kg/s, or 32 m³/h. Getting that right at the enquiry stage avoids the common mistake of a bundle sized on a flow the pump cannot deliver against the real pressure drop.
Two limits matter. The water side cannot deliver more than the steam side is condensing, so a plant that shuts steam down in summer loses hot water too unless a separate water boiler is kept. And the return temperature sets the approach: a 40 °C return gives a compact bundle, a 70 °C return needs roughly twice the surface.
Food processing is the classic case: steam for cooking and sterilising, 70-85 °C water for washing and sanitation, both through the same shifts. Laundries need steam for pressing and 80-90 °C water for the wash lines, with the ratio shifting through the day. Hospitals need steam for sterilisation and laundry, and 60-65 °C water for domestic supply, with a periodic pasteurisation cycle against Legionella that the higher water temperature makes straightforward.
The unit also simplifies the boiler house: one burner, one fuel train, one set of interlocks, one chimney. Against two boilers that is a real saving in maintenance labour, and a real reduction in what can fail at two in the morning.
No. The water side takes heat from the steam-side water volume, so with the burner off there is no output. Plants that need hot water year-round, including through a summer steam shutdown, should keep a separate hot water boiler or accept that the combined unit runs for the water load alone.
A flow switch or differential-pressure switch trips the burner within seconds, because a stalled bundle will boil and then over-pressure. The water-side safety valve is a second line of defence, not the primary one, and it must be sized on the steam flow a failed tube can pass.
No. The bundle surface is fixed when the boiler is built. A different split means a different bundle and a different shell, so the split has to be settled from the load study before the order, not adjusted during commissioning.
| Size class | 0.5 t/h | 1 t/h | 2 t/h | 4 t/h |
|---|---|---|---|---|
| Steam output | 0.5 t/h | 1 t/h | 2 t/h | 4 t/h |
| Hot water output | 0.35 MW | 0.7 MW | 1.4 MW | 2.8 MW |
| Water flow at 70/50 °C | 15 m³/h | 30 m³/h | 60 m³/h | 120 m³/h |
| Steam pressure | 1.0 MPa | 1.0 MPa | 1.25 MPa | 1.25 MPa |
| Water-side design pressure | 0.6 MPa | 0.6 MPa | 0.6 MPa | 0.6 MPa |
External links open the publisher’s website and are provided for background reading.
Include the capacity (t/h or MW), fuel, working pressure and site country so the proposal matches your permit limits.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.