0.5-4 t/h
Mobile Trailer Steam Boiler Unit, 0.5-4 t/h
Trailer-mounted packaged steam boiler, 0.5-4 t/h at 1.0-1.25 MPa, with burner, feed pump, water tank, control panel and stack on o...
View detailsSealed vacuum hot water boiler, 0.7-14 MW, 85/60 C, heat medium water boiling under negative pressure and condensing on a stainless exchanger.



A vacuum boiler makes hot water in two separate circuits. The sealed shell holds a charge of treated heat medium water and is evacuated to a pressure around -0.02 MPa or lower. At that pressure water boils at roughly 85 to 90 °C, so a burner firing into the furnace section brings the medium to boiling with only a few degrees of superheat. The vapour crosses a short space and condenses on the outside of a stainless steel tube bundle, where it releases latent heat into the secondary water inside the tubes. Condensate runs back to the sump and the cycle repeats.
The secondary circuit is an ordinary hot water circuit at whatever pressure the building needs, hydraulically isolated from the vacuum side. Nothing in the building loop ever reaches the shell, and the shell never sees building pressure. That separation is the whole point of the design.
The absolute pressure inside is below atmospheric throughout normal operation, so the shell is loaded from the outside and is built for external pressure rather than for an internal design pressure. There is no steam space that can flash to a large volume, no expanding steam bubble to relieve, and no water hammer from a collapsing bubble on the shell. Those are the failure modes a pressurised hot water boiler has to be protected against with safety valves, expansion vessels and strict water treatment.
Vacuum is not a pump running continuously. It is established at commissioning, then held by the condenser action as vapour collapses on the exchanger. Non-condensables are the enemy: air leaking in raises the absolute pressure, the boiling point climbs, output falls and the burner runs longer for the same heat. An air extractor or ejector removes them, and an annual tightness check with the shell isolated is the one maintenance task that cannot be deferred.
Condensation on the outside of the tubes gives a high heat transfer coefficient, so the exchanger is compact for its duty, and the flue gas can be taken down to a low exit temperature without a separate condenser. Measured thermal efficiency is 96% or better across the range.
The heat medium water is sealed, deaerated once and reused, so the shell does not scale and does not corrode from fresh make-up. The secondary side is a different matter: hard water will scale the inside of the stainless tubes, and scale there costs output exactly as it would in a boiler. Treat the secondary loop, and clean the exchanger on the water side on the evidence of approach temperature, not on a calendar.
The design condition is 85 °C flow and 60 °C return, which suits underfloor heating, fan coils, district substations and pool circuits. Single ZKS frames cover 0.35 to 4.2 MW; the top of the published range at 14 MW is met with several units on a common header and a lead-lag sequencer, which also gives standby capacity that a single large shell cannot. Gas consumption at 0.7 MW is 73.5 Nm³/h and at 4.2 MW is 441.2 Nm³/h, so the gas supply and the flue have to be sized for the block rather than for one unit.
Because the shell is not a pressure vessel in service, the plant room requirements are simpler than for a pressurised hot water boiler: a level slab, a flue to the required height, gas supply and a drain. Where a roof plant room or a basement with limited access is the only space available, the packaged width matters more than the weight; the widest frame here is 2.4 m. Delivery is typically 25 to 45 days after drawing approval, and commissioning takes 5 to 10 days, including evacuation, heat medium charging and burner set-up.
The shell is protected against over-pressure by the vacuum condition itself and by the control system, so it is not a pressure vessel in the usual sense. Local rules vary; the design still includes high-limit temperature protection and a low water cut-out.
The boiling point rises, output drops and the burner runs longer for the same heat. The air extractor removes small in-leakage; a persistent loss of vacuum means a joint or a tube seal needs attention.
By paralleling units on a common header with a lead-lag controller. That also gives standby, which a single shell of that size would not.
| Model | ZKS0.7-85/60-Q | ZKS1.05-85/60-Q | ZKS1.4-85/60-Q | ZKS2.1-85/60-Q | ZKS2.8-85/60-Q | ZKS4.2-85/60-Q |
|---|---|---|---|---|---|---|
| Rated heat output | 0.7 MW | 1.05 MW | 1.4 MW | 2.1 MW | 2.8 MW | 4.2 MW |
| Design pressure, shell | -0.02 MPa | -0.02 MPa | -0.02 MPa | -0.02 MPa | -0.02 MPa | -0.02 MPa |
| Outlet / return temperature | 85 / 60 °C | 85 / 60 °C | 85 / 60 °C | 85 / 60 °C | 85 / 60 °C | 85 / 60 °C |
| Water volume | 2,600 L | 3,250 L | 3,950 L | 5,950 L | 7,430 L | 9,560 L |
| Natural gas consumption | 73.5 Nm³/h | 110.3 Nm³/h | 147 Nm³/h | 220.6 Nm³/h | 294.1 Nm³/h | 441.2 Nm³/h |
| Dimensions L x W x H | 3,550 x 1,500 x 1,850 mm | 4,100 x 1,600 x 2,000 mm | 4,200 x 1,700 x 2,100 mm | 4,600 x 2,000 x 2,450 mm | 5,100 x 2,150 x 2,650 mm | 6,100 x 2,400 x 2,820 mm |
External links open the publisher’s website and are provided for background reading.
Include the capacity (t/h or MW), fuel, working pressure and site country so the proposal matches your permit limits.
We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.