12 t/h · steam boiler
12 tonne steam boiler: output, fuel bill and price band
Twelve tonnes per hour is a water-tube size. Output is 12,000 kg/h, roughly 8.4 MW, and the boiler is delivered as a D-type or double-drum unit in shipping sections rather than as one packaged shell. Site assembly, refractory and pressure testing become part of the project, not an afterthought.

Where this size fits
This is also the size where heat recovery stops being optional in most tenders. An economiser on the flue drops stack temperature by 25–40 °C and returns two to three points of efficiency; a condenser on a gas unit can add more, provided the plant has a use for the low-grade heat.
Suits a plant running continuous duty with a base load above 8 t/h. Below that, a 6 t/h unit plus a smaller standby is usually cheaper to run than a 12 t/h boiler idling at 40% load.


Load profile check
One shift
8 h/day at 80% load delivers about 76,800 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
SZS12-1.25-Y(Q)
Gas / oil, D-type water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 94–96%
- Indicative
- $86k–128k
SZL12-1.25-T
Biomass, assembled water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 87–89%
- Indicative
- $118k–168k
SZS12-1.6-Y(Q)
Gas / oil, higher pressure
- Pressure
- 1.6 MPa
- Steam temp.
- 204 °C
- Efficiency
- 94–96%
- Indicative
- $96k–140k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 921 Nm³/h · $424/h at full load
Light diesel
$62.09 per tonne · 784 kg/h · $745/h at full load
Biomass pellet
$27.91 per tonne · 2,093 kg/h · $335/h at full load
Bituminous coal
$19.02 per tonne · 1,756 kg/h · $228/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $1,016,471 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$86k–$128k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$116k–$192k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
At 12 t/h the vessel is no longer the main cost line. Burner, feedwater system, deaerator, water treatment, dust collector, insulation and installation together often exceed the pressure part. Compare bids on the full balance of plant, not on boiler price alone.
Typical duties
- Textile dyeing and finishing
- Beverage bottling
- Chemical batch reactors
- Building materials curing
For water-tube units, ask for the design feedwater temperature and the guaranteed stack temperature — those two numbers drive the efficiency claim.
Keep reading
Nearby sizes: 10 t/h boiler15 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 12 t/h steam boiler cost?
Indicative 2026 EXW range: $86k–$128k for a gas/oil packaged unit, $118k–$168k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 12 t/h boiler burn per hour?
About 921 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $424 per hour at 0.46 USD/Nm³.
Do I need a deaerator at 12 t/h?
Recommended, not mandatory. Above roughly 10 t/h the feedwater oxygen load makes mechanical deaeration plus chemical dosing the cheaper long-term choice, because tube corrosion failures cost more than the deaerator.
What is 12 t/h in MW and kcal per hour?
12 t/h is about 8.40 MW, 7,200,000 kcal/h, or roughly 768 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.