Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China

6 t/h · steam boiler

6 tonne steam boiler: output, fuel bill and price band

Six tonnes per hour — 6,000 kg/h, about 4.2 MW — is the point where packaged fire-tube designs meet their practical limit and water-tube designs start to make sense. Both are quoted at this size, and the choice usually follows fuel rather than load.

6 t/h6 × 1,000 kg steam per hour
4.20 MWthermal output
$40k–$62kgas package, indicative

WNS fire-tube boiler with the furnace and tube bundle shown
WNS fire-tube boiler with the furnace and tube bundle shown Factory render

Where this size fits

A 6 t/h gas unit is still a single packaged shell and ships complete. A 6 t/h biomass unit is normally assembled on a skid in two or three sections because the grate and furnace are longer; that changes crane requirements and site time, not the steam output.

The classic size for a single-process plant with a steady 4–5 t/h base load. If load swings wider than 3–8 t/h, a water-tube unit with a smaller minimum stable load or a pair of boilers is easier to operate.

Water-tube boiler with a chain grate stoker
Water-tube boiler with a chain grate stoker
Welding bay with boiler shells and drum sections
Welding bay with boiler shells and drum sections

Load profile check

One shift

8 h/day at 80% load delivers about 38,400 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

WNS6-1.25-Y(Q)

Gas / oil, 3-pass wet-back

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
94–96%
Indicative
$40k–62k

SZL6-1.25-T

Biomass, assembled water-tube

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
86–88%
Indicative
$58k–84k

DZL6-1.25-T

Biomass / coal, chain grate

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
85–87%
Indicative
$52k–76k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 460 Nm³/h · $212/h at full load

Light diesel

$62.09 per tonne · 392 kg/h · $373/h at full load

Biomass pellet

$27.91 per tonne · 1,047 kg/h · $167/h at full load

Bituminous coal

$19.02 per tonne · 878 kg/h · $114/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $508,235 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$40k–$62k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$54k–$93k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

Six-tonne pricing splits cleanly by fuel: gas/oil packaged units sit in the low tens of thousands, biomass chain-grate units roughly 40% higher because of the grate, fuel handling and ash systems. Auxiliary scope explains most of the remaining spread.

Typical duties

  • Sugar and starch plants
  • Palm oil mills
  • Plywood and MDF lines
  • District heating sub-stations

Ask for the auxiliary list in writing — feedwater pump, softener, deaerator, economiser, dust collector and chimney are frequently quoted separately.

Questions buyers ask at this size

What does a 6 t/h steam boiler cost?

Indicative 2026 EXW range: $40k–$62k for a gas/oil packaged unit, $58k–$84k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 6 t/h boiler burn per hour?

About 460 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $212 per hour at 0.46 USD/Nm³.

Why is a 6 t/h biomass boiler so much dearer than gas?

Because the quote includes a chain grate, fuel bunker, ash removal and usually a dust collector. The pressure vessel is comparable; the solid-fuel handling and flue cleaning systems are what add the 40% and the maintenance routine.

What is 6 t/h in MW and kcal per hour?

6 t/h is about 4.20 MW, 3,600,000 kcal/h, or roughly 384 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote