5 t/h · steam boiler
5 tonne steam boiler: output, fuel bill and price band
Five tonnes per hour — 5,000 kg/h, 3.5 MW — sits at the top of the packaged fire-tube range that most plants buy. Above it, water-tube designs start to compete on footprint and part-load behaviour, and the project stops being a purchase and becomes an installation.

Where this size fits
The operating consequence at this size is turndown. A plant that idles at 1 t/h and peaks at 5 t/h needs a burner that holds flame at 5:1. Most packaged gas burners do; most chain-grate biomass units do not, which is why biomass at 5 t/h usually comes with a steam accumulator or a second, smaller boiler for the night load.
The classic size for a plant that runs 24 hours at a 3.5–4.5 t/h base load. Below a 3 t/h average, the 4 t/h unit will cycle less and cost less to run.


Load profile check
One shift
8 h/day at 80% load delivers about 32,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
WNS5-1.25-Y(Q)
Gas/oil, 3-pass wet-back
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 93–95%
- Indicative
- $34k–52k
SZL5-1.25-T
Biomass, assembled water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 86–88%
- Indicative
- $48k–68k
WNS5-1.6-Y(Q)
Gas/oil, higher pressure
- Pressure
- 1.6 MPa
- Steam temp.
- 204 °C
- Efficiency
- 93–95%
- Indicative
- $38k–57k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 384 Nm³/h · $176/h at full load
Light diesel
$62.09 per tonne · 327 kg/h · $310/h at full load
Biomass pellet
$27.91 per tonne · 872 kg/h · $140/h at full load
Bituminous coal
$19.02 per tonne · 732 kg/h · $95/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $423,529 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$34k–$52k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$46k–$78k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
At 5 t/h buyers start to see turnkey offers, which bundle boiler, burner, feedwater, economiser and erection into one number. Turnkey is not automatically dearer: it usually is, by 15–25%, but it moves the interface risk to the supplier. Compare it against a split-package bid only if you have engineering capacity in-house.
Typical duties
- Textile dyeing and finishing
- Food and beverage plants
- Paper and packaging
- Small district heating schemes
Ask for the guaranteed efficiency at 50% load, not only at full fire. A 5 t/h unit in a plant that draws 2 t/h most of the day spends its life at part load, where the differences between burners show.
Keep reading
Nearby sizes: 4 t/h boiler6 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 5 t/h steam boiler cost?
Indicative 2026 EXW range: $34k–$52k for a gas/oil packaged unit, $47k–$68k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 5 t/h boiler burn per hour?
About 384 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $176 per hour at 0.46 USD/Nm³.
Is 5 t/h the largest packaged fire-tube boiler?
Not strictly — packaged fire-tube units exist up to about 8 t/h. But above 5 t/h the shell becomes awkward to transport and the water-tube alternative starts to win on footprint and response, so 5–6 t/h is the practical upper end of the fire-tube market.
What is 5 t/h in MW and kcal per hour?
5 t/h is about 3.50 MW, 3,000,000 kcal/h, or roughly 320 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.