50 t/h · steam boiler
50 tonne steam boiler: output, fuel bill and price band
Fifty tonnes per hour produces 35 MW of thermal output. It is usually part of a cogeneration or utility scheme rather than a stand-alone boiler, and it is specified alongside turbines, let-down stations and a plant-wide steam balance.

Where this size fits
At this scale the boiler is one line in a system study. Steam level selection — 1.6 MPa versus 2.5 MPa versus 3.8 MPa — is fixed by the process and the turbine, and the boiler follows. Retrofitting pressure later is not feasible.
Only justified where the site has a genuine 35–45 t/h continuous demand or a cogeneration scheme. For process steam alone, two 25 t/h units usually give better availability and part-load behaviour.


Load profile check
One shift
8 h/day at 80% load delivers about 320,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
SZS50-1.6-Y(Q)
Gas / oil, D-type water-tube
- Pressure
- 1.6 MPa
- Steam temp.
- 204 °C
- Efficiency
- 94–96%
- Indicative
- $315k–465k
SZS50-2.5-Y(Q)
Gas / oil, 2.5 MPa
- Pressure
- 2.5 MPa
- Steam temp.
- 226 °C
- Efficiency
- 94–96%
- Indicative
- $345k–505k
SZL50-1.6-T
Biomass, water-tube
- Pressure
- 1.6 MPa
- Steam temp.
- 204 °C
- Efficiency
- 87–89%
- Indicative
- $370k–520k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 3,836 Nm³/h · $1,765/h at full load
Light diesel
$62.09 per tonne · 3,268 kg/h · $3,105/h at full load
Biomass pellet
$27.91 per tonne · 8,721 kg/h · $1,395/h at full load
Bituminous coal
$19.02 per tonne · 7,317 kg/h · $951/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $4,235,294 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$315k–$465k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$425k–$698k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
Fifty-tonne supply is a multi-month engineering contract. Payment milestones, performance bonds, spare-parts lists and commissioning support weigh as much as the equipment price, and the cheapest bid is rarely the lowest total cost.
Typical duties
- Utility power and cogeneration
- Large chemical sites
- Pulp and paper integrated mills
- Municipal heating plants
For cogeneration, define the steam extraction and let-down conditions before selecting the boiler; they set the pressure and the control philosophy.
Keep reading
Nearby sizes: 40 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 50 t/h steam boiler cost?
Indicative 2026 EXW range: $315k–$465k for a gas/oil packaged unit, $370k–$520k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 50 t/h boiler burn per hour?
About 3,836 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $1,765 per hour at 0.46 USD/Nm³.
One 50 t/h boiler or two 25 t/h units?
Two units cost more to buy and to house, but they keep the plant running through maintenance and follow load better. A single 50 t/h unit is cheaper per tonne only if the site genuinely holds a 35–45 t/h base load.
What is 50 t/h in MW and kcal per hour?
50 t/h is about 35.00 MW, 30,000,000 kcal/h, or roughly 3,200 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.