Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China

50 t/h · steam boiler

50 tonne steam boiler: output, fuel bill and price band

Fifty tonnes per hour produces 35 MW of thermal output. It is usually part of a cogeneration or utility scheme rather than a stand-alone boiler, and it is specified alongside turbines, let-down stations and a plant-wide steam balance.

50 t/h50 × 1,000 kg steam per hour
35.00 MWthermal output
$315k–$465kgas package, indicative

Water-tube boiler with a chain grate stoker
Water-tube boiler with a chain grate stoker Factory render

Where this size fits

At this scale the boiler is one line in a system study. Steam level selection — 1.6 MPa versus 2.5 MPa versus 3.8 MPa — is fixed by the process and the turbine, and the boiler follows. Retrofitting pressure later is not feasible.

Only justified where the site has a genuine 35–45 t/h continuous demand or a cogeneration scheme. For process steam alone, two 25 t/h units usually give better availability and part-load behaviour.

Welding bay with boiler shells and drum sections
Welding bay with boiler shells and drum sections
Pressure vessel shell on turning rolls in the assembly hall
Pressure vessel shell on turning rolls in the assembly hall

Load profile check

One shift

8 h/day at 80% load delivers about 320,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

SZS50-1.6-Y(Q)

Gas / oil, D-type water-tube

Pressure
1.6 MPa
Steam temp.
204 °C
Efficiency
94–96%
Indicative
$315k–465k

SZS50-2.5-Y(Q)

Gas / oil, 2.5 MPa

Pressure
2.5 MPa
Steam temp.
226 °C
Efficiency
94–96%
Indicative
$345k–505k

SZL50-1.6-T

Biomass, water-tube

Pressure
1.6 MPa
Steam temp.
204 °C
Efficiency
87–89%
Indicative
$370k–520k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 3,836 Nm³/h · $1,765/h at full load

Light diesel

$62.09 per tonne · 3,268 kg/h · $3,105/h at full load

Biomass pellet

$27.91 per tonne · 8,721 kg/h · $1,395/h at full load

Bituminous coal

$19.02 per tonne · 7,317 kg/h · $951/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $4,235,294 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$315k–$465k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$425k–$698k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

Fifty-tonne supply is a multi-month engineering contract. Payment milestones, performance bonds, spare-parts lists and commissioning support weigh as much as the equipment price, and the cheapest bid is rarely the lowest total cost.

Typical duties

  • Utility power and cogeneration
  • Large chemical sites
  • Pulp and paper integrated mills
  • Municipal heating plants

For cogeneration, define the steam extraction and let-down conditions before selecting the boiler; they set the pressure and the control philosophy.

Questions buyers ask at this size

What does a 50 t/h steam boiler cost?

Indicative 2026 EXW range: $315k–$465k for a gas/oil packaged unit, $370k–$520k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 50 t/h boiler burn per hour?

About 3,836 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $1,765 per hour at 0.46 USD/Nm³.

One 50 t/h boiler or two 25 t/h units?

Two units cost more to buy and to house, but they keep the plant running through maintenance and follow load better. A single 50 t/h unit is cheaper per tonne only if the site genuinely holds a 35–45 t/h base load.

What is 50 t/h in MW and kcal per hour?

50 t/h is about 35.00 MW, 30,000,000 kcal/h, or roughly 3,200 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote