8 tonne steam boiler: output, fuel bill and price band

Eight tonnes per hour — 8,000 kg/h, 5.6 MW — is the fork in the road. Both fire-tube and water-tube designs are quoted at this size, and the choice follows the load profile more than the price: fire-tube for steady industrial duty, water-tube where the load swings or where steam is needed quickly after a cold start.

8 t/h8 × 1,000 kg steam per hour
5.60 MWthermal output
$54k–$82kgas package, indicative

Water-tube boiler with a chain grate stoker
Water-tube boiler with a chain grate stoker Factory render

Where this size fits

A packaged 8 t/h fire-tube is a large object: roughly 9 m long, 3 m wide and over 30 tonnes. Road transport is possible in most markets but needs permits, and the crane at site has to be sized for the whole shell. A water-tube unit in shipping sections costs more to erect and less to move.

For a continuous plant with a 5.5–7 t/h base load. If the daily pattern has a cold start and a fast ramp, the water-tube option on this page is the better match even at a higher price.

D-class packaged boiler in a cabinet enclosure
D-class packaged boiler in a cabinet enclosure
Pressure vessel shell on turning rolls in the assembly hall
Pressure vessel shell on turning rolls in the assembly hall

Load profile check

One shift

8 h/day at 80% load delivers about 51,200 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

WNS8-1.25-Y(Q)

Gas/oil, large packaged fire-tube

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
94–96%
Indicative
$54k–82k

SZL8-1.25-T

Biomass, assembled water-tube

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
87–89%
Indicative
$80k–115k

SZS8-1.25-Y(Q)

Gas/oil, D-type water-tube

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
94–96%
Indicative
$62k–92k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 614 Nm³/h · $282/h at full load

Light diesel

$62.09 per tonne · 523 kg/h · $497/h at full load

Biomass pellet

$27.91 per tonne · 1,395 kg/h · $223/h at full load

Bituminous coal

$19.02 per tonne · 1,171 kg/h · $152/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $677,647 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$54k–$82k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$73k–$123k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

At 8 t/h the burner, feedwater system and flue cleaning are together worth more than the pressure vessel. Bids that quote a boiler price without the auxiliary list are not comparable — ask for the balance of plant as a separate line and compare totals.

Typical duties

  • Sugar and starch plants
  • Textile plants with dyeing
  • Plywood and MDF lines
  • Food processing estates

For biomass at this size, ask for the grate area and the fuel specification separately. A unit sized on 4,000 kcal/kg pellets will not hold rated output on wet wood chips, and the shortfall appears as a capacity argument after commissioning.

Questions buyers ask at this size

What does a 8 t/h steam boiler cost?

Indicative 2026 EXW range: $54k–$82k for a gas/oil packaged unit, $78k–$112k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 8 t/h boiler burn per hour?

About 614 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $282 per hour at 0.46 USD/Nm³.

Fire-tube or water-tube at 8 t/h?

Fire-tube for steady load, lower capital cost and simpler operation. Water-tube for faster response, better part-load behaviour and a smaller footprint per tonne of steam. Above 8 t/h, water-tube is the normal choice; at 8 t/h it is genuinely a judgement call.

What is 8 t/h in MW and kcal per hour?

8 t/h is about 5.60 MW, 4,800,000 kcal/h, or roughly 512 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote