15 t/h · steam boiler
15 tonne steam boiler: output, fuel bill and price band
Fifteen tonnes per hour — 10.5 MW — is the smallest size where plants normally specify a deaerator as standard rather than as an option. At this output the feedwater oxygen budget matters to tube life, and mechanical deaeration plus chemical dosing is the normal package.

Where this size fits
The step from 12 to 15 t/h is small in price and large in operating flexibility: the same shell family, a longer furnace and a bigger burner. If your five-year plan includes another line, buying the 15 t/h now is usually cheaper than adding a second boiler later.
Good match for a plant whose peak is 12–13 t/h with occasional 15 t/h excursions. The extra headroom lets the boiler stay below full fire, which cuts NOx and noise.


Load profile check
One shift
8 h/day at 80% load delivers about 96,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
SZS15-1.25-Y(Q)
Gas / oil, D-type water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 94–96%
- Indicative
- $104k–155k
SZL15-1.25-T
Biomass, assembled water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 87–89%
- Indicative
- $142k–198k
SZS15-2.5-Y(Q)
Gas / oil, 2.5 MPa
- Pressure
- 2.5 MPa
- Steam temp.
- 226 °C
- Efficiency
- 94–96%
- Indicative
- $118k–172k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 1,151 Nm³/h · $529/h at full load
Light diesel
$62.09 per tonne · 980 kg/h · $931/h at full load
Biomass pellet
$27.91 per tonne · 2,616 kg/h · $419/h at full load
Bituminous coal
$19.02 per tonne · 2,195 kg/h · $285/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $1,270,588 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$104k–$155k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$140k–$233k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
Prices at 15 t/h are increasingly quoted as a complete boiler house: boiler, burner, economiser, deaerator, dosing, water treatment, controls and erection. A bare vessel quote at this size is not comparable with a turnkey number.
Typical duties
- Paper and board machines
- Large laundries and dye houses
- Food canneries
- Pharmaceutical bulk production
Confirm the local emission limit and the reference oxygen level before fixing the burner; retrofitting a low-NOx burner later costs far more than specifying it.
Keep reading
Nearby sizes: 12 t/h boiler20 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 15 t/h steam boiler cost?
Indicative 2026 EXW range: $104k–$155k for a gas/oil packaged unit, $142k–$198k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 15 t/h boiler burn per hour?
About 1,151 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $529 per hour at 0.46 USD/Nm³.
What footprint does a 15 t/h water-tube boiler need?
Plan for roughly 12 × 8 m of boiler house plus flue and auxiliary space, with crane access for the heaviest module. Exact dimensions come from the general arrangement drawing, which should be issued before civil works start.
What is 15 t/h in MW and kcal per hour?
15 t/h is about 10.50 MW, 9,000,000 kcal/h, or roughly 960 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.