Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China

30 t/h · steam boiler

30 tonne steam boiler: output, fuel bill and price band

Thirty tonnes per hour, about 21 MW, sits at the top of the packaged water-tube range before designs move to field-erected utility boilers. Most units at this size are D-type with a single drum and membrane walls, shipped in modules that fit standard flat-rack or open-top containers.

30 t/h30 × 1,000 kg steam per hour
21.00 MWthermal output
$198k–$292kgas package, indicative

Water-tube boiler with a chain grate stoker
Water-tube boiler with a chain grate stoker Factory render

Where this size fits

Fuel flexibility becomes a commercial question here. A dual-fuel burner that runs gas normally and oil during curtailment costs more upfront but is often the difference between stopping production and continuing through a supply interruption.

Appropriate for a site with 20–26 t/h continuous demand and a steam network with several users. Below that, part-load operation erodes the efficiency gain over a 20 t/h unit.

Dispatch desk coordinating production and shipping
Dispatch desk coordinating production and shipping
Pressure vessel shell on turning rolls in the assembly hall
Pressure vessel shell on turning rolls in the assembly hall

Load profile check

One shift

8 h/day at 80% load delivers about 192,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

SZS30-1.6-Y(Q)

Gas / oil, D-type water-tube

Pressure
1.6 MPa
Steam temp.
204 °C
Efficiency
94–96%
Indicative
$198k–292k

SZS30-2.5-Y(Q)

Gas / oil, 2.5 MPa

Pressure
2.5 MPa
Steam temp.
226 °C
Efficiency
94–96%
Indicative
$218k–318k

SZL30-1.6-T

Biomass, water-tube

Pressure
1.6 MPa
Steam temp.
204 °C
Efficiency
87–89%
Indicative
$240k–335k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 2,302 Nm³/h · $1,059/h at full load

Light diesel

$62.09 per tonne · 1,961 kg/h · $1,863/h at full load

Biomass pellet

$27.91 per tonne · 5,233 kg/h · $837/h at full load

Bituminous coal

$19.02 per tonne · 4,390 kg/h · $571/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $2,541,176 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$198k–$292k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$267k–$438k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

Thirty-tonne pricing is dominated by the balance of plant: feedwater treatment, deaerator, economiser, stack, burner controls and erection can add 40–60% to the vessel price. Budget the whole system before comparing suppliers.

Typical duties

  • Chemical complexes
  • Large beverage plants
  • Board and packaging mills
  • District energy schemes

Dual-fuel capability needs a fuel train, changeover logic and a permit review; it is not a burner-only upgrade.

Questions buyers ask at this size

What does a 30 t/h steam boiler cost?

Indicative 2026 EXW range: $198k–$292k for a gas/oil packaged unit, $240k–$335k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 30 t/h boiler burn per hour?

About 2,302 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $1,059 per hour at 0.46 USD/Nm³.

Is dual fuel worth it at 30 t/h?

Only if a gas interruption would stop production. The premium is roughly 8–12% of the burner and fuel-train cost, plus permitting. Where gas supply is firm, the money is better spent on heat recovery.

What is 30 t/h in MW and kcal per hour?

30 t/h is about 21.00 MW, 18,000,000 kcal/h, or roughly 1,920 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote