4 t/h · steam boiler
4 tonne steam boiler: output, fuel bill and price band
Four tonnes per hour produces 4,000 kg/h of steam, about 2.8 MW. It is still a single packaged shell — the largest that travels comfortably as one piece — and it is the size at which economisers become standard rather than optional on gas units.

Where this size fits
The economiser is the cheapest efficiency you will buy on this page: 25–40 °C off the stack temperature returns two to three points, which on a 4 t/h unit running 6,000 hours a year is real money. It also drops the flue gas temperature below what many local rules require for a new installation.
For a plant with a 2.8–3.6 t/h base load and a modest peak. If the peak regularly exceeds 4 t/h for more than two hours, the 5 t/h page is the better fit.


Load profile check
One shift
8 h/day at 80% load delivers about 25,600 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
WNS4-1.25-Y(Q)
Gas/oil, 3-pass wet-back
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 93–95%
- Indicative
- $28k–44k
SZL4-1.25-T
Biomass, assembled water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 86–88%
- Indicative
- $42k–60k
WNS4-1.6-Y(Q)
Gas/oil, higher pressure
- Pressure
- 1.6 MPa
- Steam temp.
- 204 °C
- Efficiency
- 93–95%
- Indicative
- $32k–49k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 307 Nm³/h · $141/h at full load
Light diesel
$62.09 per tonne · 261 kg/h · $248/h at full load
Biomass pellet
$27.91 per tonne · 698 kg/h · $112/h at full load
Bituminous coal
$19.02 per tonne · 585 kg/h · $76/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $338,824 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$28k–$44k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$38k–$66k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
Quotes at 4 t/h split cleanly between plants that build one shell a day and plants that build one a week. The second group charges more and delivers better documentation. For an export project, ask for a sample inspection dossier before choosing on price.
Typical duties
- Beverage bottling
- Palm oil and edible oil refining
- Furniture and wood processing
- Automotive parts washing
If the plant may later need 1.6 MPa, buy it now. Re-rating a shell is not economic, and the price difference at 4 t/h is typically under 10%.
Keep reading
Nearby sizes: 3 t/h boiler5 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 4 t/h steam boiler cost?
Indicative 2026 EXW range: $28k–$44k for a gas/oil packaged unit, $40k–$58k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 4 t/h boiler burn per hour?
About 307 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $141 per hour at 0.46 USD/Nm³.
Is 1.25 MPa enough for a 4 t/h boiler?
It covers saturated steam up to 194 °C, which is enough for most food, textile and laundry processes. It is not enough where a user needs 200 °C or more, where steam is superheated, or where line losses across a long header would drop the pressure below the process requirement.
What is 4 t/h in MW and kcal per hour?
4 t/h is about 2.80 MW, 2,400,000 kcal/h, or roughly 256 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.