The peak, not the average, sizes the boiler

10 t/h at 1.25 MPa is the working point for a textile dyeing plant in Narayanganj, Bangladesh, where the dye house opens six jets at shift start and the header used to fall to 0.9 MPa. The unit was selected on that operating pattern rather than on a catalogue rating, and the difference shows in how it holds pressure on the worst shift of the week.

Every steam plant has an average load and a sizing load, and they are rarely the same. Batch vessels, CIP sets, retort start-ups and shift changes draw more steam in ten minutes than the plant uses in an hour. A boiler selected on the daily average will hold pressure on paper and lose it every morning, and the operator’s answer is usually to raise the setpoint, which wastes fuel for the other twenty-three hours.

Numbers that decide the design

At 10 t/h and 1.25 MPa the unit absorbs about 7.2 MW. On natural gas at roughly 94% efficiency, full-load demand is about 775 Nm3/h. The figures are stated at the site’s conditions, because ambient temperature, altitude and fuel analysis all move them.

Design point
Item Value
Rated output 10 t/h
Pressure / temperature 1.25 MPa
Fuel natural gas
Full-load fuel demand 775 Nm3/h
Thermal efficiency about 94%

What to watch on site

The practical method is to log the header at one-minute resolution for two weeks, including the worst day, then size on the fifteen-minute peak with a 10% margin. Staggering the largest consumers by ten to twenty minutes often removes a third of the peak at no capital cost. Where the process cannot be staggered, a steam accumulator shaves the peak and lets the boiler run on a flat load.

Site note: the dye house opens six jets at shift start and the header used to fall to 0.9 MPa. The operators log header pressure and stack temperature every two hours, which is enough to see fouling and load drift before either becomes a shutdown.

Why it matters

The peak, not the average, sizes the boiler is not a detail to settle after the order. It decides the shell size, the burner, the feedwater train and the maintenance calendar, and it is cheaper to get right in the specification than in the boiler house.

Equipment used in this kind of plant: wns gas steam boiler and economizer. The industry side is covered in this solution page, and project cases show comparable installations.

Background reading: external reference on steam and process heat.

Questions plant engineers ask

Should a boiler be sized on peak or average load?

Size on the fifteen-minute peak with about 10% margin, and use the average only to check annual fuel use. Sizing on the average guarantees a pressure dip at every start-up.

How much does a steam accumulator help?

A well-sized accumulator can cover 10-20 minutes of peak by releasing flash steam, which is often enough to avoid buying the next boiler size up.