Two fuels, one burner
3 t/h at 1.0 MPa is the working point for a food plant in Lagos, Nigeria, where gas pressure sags in the afternoon and the burner trips on low pressure. The unit was selected on that operating pattern rather than on a catalogue rating, and the difference shows in how it holds pressure on the worst shift of the week.
Dual-fuel is bought as insurance, not as a way to chase price. The plant runs on gas while the network holds, and switches to oil when it does not. The value is measured in production days saved, not in the oil’s calorific value. A combination burner carries two fuel trains, two sets of safety shut-off valves and a changeover sequence that must prove the unused fuel is isolated before ignition.
Numbers that decide the design
At 3 t/h and 1.0 MPa the unit absorbs about 2.2 MW. On natural gas at roughly 94% efficiency, full-load demand is about 232 Nm3/h. The figures are stated at the site’s conditions, because ambient temperature, altitude and fuel analysis all move them.
| Item | Value |
|---|---|
| Rated output | 3 t/h |
| Pressure / temperature | 1.0 MPa |
| Fuel | natural gas |
| Full-load fuel demand | 232 Nm3/h |
| Thermal efficiency | about 94% |
What to watch on site
Oil needs preheating to about 40 °C for atomisation, and its flame is longer and brighter than gas, so the furnace and the combustion curve are set for the heavier fuel and then trimmed for gas. Storage is the hidden cost: a bunded tank, a transfer pump, a heater and a periodic fuel-quality check. Plants that skip the checks usually discover water or sludge at the worst moment.
Site note: gas pressure sags in the afternoon and the burner trips on low pressure. The operators log header pressure and stack temperature every two hours, which is enough to see fouling and load drift before either becomes a shutdown.
Why it matters
Two fuels, one burner is not a detail to settle after the order. It decides the shell size, the burner, the feedwater train and the maintenance calendar, and it is cheaper to get right in the specification than in the boiler house.
Equipment used in this kind of plant: wns gas steam boiler and economizer. The industry side is covered in this solution page, and project cases show comparable installations.
Background reading: external reference on steam and process heat.
Questions plant engineers ask
How long does a gas-to-oil changeover take?
About 30 minutes including purge, burner restart and stabilisation. The boiler stays hot, so steam follows quickly.
Is dual-fuel efficiency lower on oil?
Usually 1-2 points lower because of atomisation and preheating losses, but a well-set combination burner stays close to its gas figures.
Related note: 4 t/h Gas steam boiler in Ghana: Condensate is money coming back



