Capacity & Cost guide Industrial boiler manufacturer since 1965 Taikang, Zhoukou, Henan, China

2 t/h · steam boiler

2 tonne steam boiler: output, fuel bill and price band

Two tonnes per hour is the workhorse of the industrial range: 2,000 kg/h, about 1.4 MW. It is the size most often bought second-hand and most often rebuilt, because the shell is simple enough to last decades and the market for used units is deep.

2 t/h2 × 1,000 kg steam per hour
1.40 MWthermal output
$15k–$24kgas package, indicative

WNS fire-tube boiler with the furnace and tube bundle shown
WNS fire-tube boiler with the furnace and tube bundle shown Factory render

Where this size fits

At 2 t/h the balance of plant starts to matter as much as the boiler. A softener is no longer optional, the feedwater tank needs a deaerating head or a chemical programme, and the steam header needs a proper trap set. Buyers who spend the whole budget on the boiler and nothing on water treatment lose the difference in scale and tube failures within two years.

The sweet spot for a two-shift plant with a 1.4–1.8 t/h average and a short peak. Above a 2 t/h average, the 3 t/h page is the better economic match.

Packaged boiler orange burner
Packaged boiler orange burner
Control panel inspection before factory testing
Control panel inspection before factory testing

Load profile check

One shift

8 h/day at 80% load delivers about 12,800 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

WNS2-1.25-Y(Q)

Gas/oil, 3-pass wet-back

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
92–94%
Indicative
$15k–24k

DZL2-1.25-T

Biomass/coal, chain grate

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
84–86%
Indicative
$22k–33k

WDR2-1.25-D

Electric, 3-stage heating

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
98%
Indicative
$18k–26k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 153 Nm³/h · $71/h at full load

Light diesel

$62.09 per tonne · 131 kg/h · $124/h at full load

Biomass pellet

$27.91 per tonne · 349 kg/h · $56/h at full load

Bituminous coal

$19.02 per tonne · 293 kg/h · $38/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $169,412 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$15k–$24k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$20k–$36k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

This is the most competitive export size in China, with dozens of plants quoting the same specification. Price differences of 40% between bids are normal and are almost entirely explained by the auxiliary list: pump set, softener, economiser, burner class and controls. Compare the lists before the prices.

Typical duties

  • Food processing and packing lines
  • Textile finishing
  • Paper converting
  • Hospitals and hotel laundries

One millimetre of scale costs roughly one percent of fuel. On a 2 t/h unit running 4,000 hours a year that is more than the price difference between a good softener and a cheap one.

Questions buyers ask at this size

What does a 2 t/h steam boiler cost?

Indicative 2026 EXW range: $15k–$24k for a gas/oil packaged unit, $22k–$33k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 2 t/h boiler burn per hour?

About 153 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $71 per hour at 0.46 USD/Nm³.

How much steam does a 2 t/h boiler make in a day?

At 80% load over one eight-hour shift, about 12,800 kg. Over two shifts at 75%, about 24,000 kg. Multiply by your own shift pattern rather than relying on a daily figure — the boiler makes what the plant draws, not what the nameplate says.

What is 2 t/h in MW and kcal per hour?

2 t/h is about 1.40 MW, 1,200,000 kcal/h, or roughly 128 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote