3 t/h · steam boiler
3 tonne steam boiler: output, fuel bill and price band
Three tonnes per hour — 3,000 kg/h, 2.1 MW — is where a plant stops being small. The unit is still packaged, still ships in one piece, but the ancillary scope now includes a deaerator head, a blowdown heat recovery step and a control panel that logs rather than merely indicates.

Where this size fits
The interesting choice at 3 t/h is between one boiler and two. A single 3 t/h unit is cheaper to buy, house and maintain, and runs at better part-load efficiency than two 1.5 t/h units. Two smaller units survive a breakdown and cover a summer/winter swing. For a plant with a critical single process, redundancy usually wins; for a plant with a steady load, the single unit does.
Suits a three-shift operation with a base load above 1.5 t/h. If the load swings between 0.5 and 3 t/h daily, a steam accumulator is often cheaper than oversizing.


Load profile check
One shift
8 h/day at 80% load delivers about 19,200 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.
Two shifts
16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.
Continuous
24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.
Machines at this output
WNS3-1.25-Y(Q)
Gas/oil, 3-pass wet-back
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 93–95%
- Indicative
- $21k–33k
DZL3-1.25-T
Biomass/coal, chain grate
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 84–86%
- Indicative
- $30k–45k
SZL3-1.25-T
Biomass, assembled water-tube
- Pressure
- 1.25 MPa
- Steam temp.
- 194 °C
- Efficiency
- 86–88%
- Indicative
- $34k–48k
Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.
What a tonne of steam costs
Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.
Natural gas
$35.29 per tonne · 230 Nm³/h · $106/h at full load
Light diesel
$62.09 per tonne · 196 kg/h · $186/h at full load
Biomass pellet
$27.91 per tonne · 523 kg/h · $84/h at full load
Bituminous coal
$19.02 per tonne · 439 kg/h · $57/h at full load
At eight hours a day and 300 days a year, the gas line alone is about $254,118 a year at full fire. Electricity, water, labour and maintenance are excluded.
Market price map
Equipment only
$21k–$33k
Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.
Packaged skid
$28k–$50k
Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.
Turnkey
+35–60%
Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.
At 3 t/h the gap between a Chinese domestic quote and a European one narrows to two to three times, and the difference is mostly documentation, local service and certification rather than manufacturing cost. Ask what the extra buys before assuming it is quality.
Typical duties
- Dairy and beverage plants
- Poultry and meat processing
- Chemical batch reactors
- Plywood and board lines
Specify the feedwater temperature you will actually achieve. A boiler rated at 20 °C feedwater and operated at 60 °C shows a better efficiency than the datasheet, which is a legitimate gain but makes bid comparison misleading.
Keep reading
Nearby sizes: 2 t/h boiler4 t/h boiler
Machines in this range
Closest reference projects
Questions buyers ask at this size
What does a 3 t/h steam boiler cost?
Indicative 2026 EXW range: $21k–$33k for a gas/oil packaged unit, $30k–$45k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.
How much gas does a 3 t/h boiler burn per hour?
About 230 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $106 per hour at 0.46 USD/Nm³.
One 3 t/h boiler or two 1.5 t/h units?
One unit if the load is steady and a stoppage can be planned; two units if the process cannot stop. Two smaller units cost roughly 15–25% more installed and take more floor space, but they let you maintain one while the other runs.
What is 3 t/h in MW and kcal per hour?
3 t/h is about 2.10 MW, 1,800,000 kcal/h, or roughly 192 boiler horsepower.
Sources and further reading
- Spirax Sarco — steam engineering tutorials: steam tables, enthalpy and blowdown practice.
- U.S. Department of Energy — steam systems: load profiling and steam-system efficiency measures.
- ASME Boiler and Pressure Vessel Code, Section I: the construction standard referenced by many export projects.
Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.