5 tonne steam boiler: output, fuel bill and price band

Five tonnes per hour — 5,000 kg/h, 3.5 MW — sits at the top of the packaged fire-tube range that most plants buy. Above it, water-tube designs start to compete on footprint and part-load behaviour, and the project stops being a purchase and becomes an installation.

5 t/h5 × 1,000 kg steam per hour
3.50 MWthermal output
$34k–$52kgas package, indicative

Packaged steam boiler low NOx
Packaged steam boiler low NOx

Where this size fits

The operating consequence at this size is turndown. A plant that idles at 1 t/h and peaks at 5 t/h needs a burner that holds flame at 5:1. Most packaged gas burners do; most chain-grate biomass units do not, which is why biomass at 5 t/h usually comes with a steam accumulator or a second, smaller boiler for the night load.

The classic size for a plant that runs 24 hours at a 3.5–4.5 t/h base load. Below a 3 t/h average, the 4 t/h unit will cycle less and cost less to run.

Skid mounted steam boiler
Skid mounted steam boiler
Packaged fire-tube boiler with a pressure-jet burner
Packaged fire-tube boiler with a pressure-jet burner

Load profile check

One shift

8 h/day at 80% load delivers about 32,000 kg of steam a day. Steam demand is concentrated; the boiler starts cold each morning.

Two shifts

16 h/day at 75% average is the usual sweet spot for this size: the unit stays in modulation and avoids a second cold start.

Continuous

24 h at 70–85% load is where the efficiency figures in this page actually hold. Below 50% load, expect the fuel cost per tonne to rise.

Machines at this output

WNS5-1.25-Y(Q)

Gas/oil, 3-pass wet-back

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
93–95%
Indicative
$34k–52k

SZL5-1.25-T

Biomass, assembled water-tube

Pressure
1.25 MPa
Steam temp.
194 °C
Efficiency
86–88%
Indicative
$48k–68k

WNS5-1.6-Y(Q)

Gas/oil, higher pressure

Pressure
1.6 MPa
Steam temp.
204 °C
Efficiency
93–95%
Indicative
$38k–57k

Efficiency ranges assume LHV basis and a clean unit at rated load. Local emission limits may require a low-NOx burner and, on gas, flue-gas recirculation.

What a tonne of steam costs

Basis: 600,000 kcal per tonne of steam at 1.25 MPa with 68 °C feedwater; gas 8,500 kcal/Nm³ at 0.46 USD/Nm³; diesel 10,200 kcal/kg at 0.95 USD/kg; biomass 4,000 kcal/kg at 0.16 USD/kg; coal 5,000 kcal/kg at 0.13 USD/kg. Efficiency 92% gas, 90% diesel, 86% biomass, 82% coal.

Natural gas

$35.29 per tonne · 384 Nm³/h · $176/h at full load

Light diesel

$62.09 per tonne · 327 kg/h · $310/h at full load

Biomass pellet

$27.91 per tonne · 872 kg/h · $140/h at full load

Bituminous coal

$19.02 per tonne · 732 kg/h · $95/h at full load

At eight hours a day and 300 days a year, the gas line alone is about $423,529 a year at full fire. Electricity, water, labour and maintenance are excluded.

Market price map

Equipment only

$34k–$52k

Boiler body, burner, control panel. Excludes feedwater, economiser, water treatment, flue and erection.

Packaged skid

$46k–$78k

Adds feedwater pump set, softener, economiser and the interconnecting pipework on a common frame.

Turnkey

+35–60%

Adds foundation, flue and stack, electrical, insulation, erection, commissioning and performance test.

At 5 t/h buyers start to see turnkey offers, which bundle boiler, burner, feedwater, economiser and erection into one number. Turnkey is not automatically dearer: it usually is, by 15–25%, but it moves the interface risk to the supplier. Compare it against a split-package bid only if you have engineering capacity in-house.

Typical duties

  • Textile dyeing and finishing
  • Food and beverage plants
  • Paper and packaging
  • Small district heating schemes

Ask for the guaranteed efficiency at 50% load, not only at full fire. A 5 t/h unit in a plant that draws 2 t/h most of the day spends its life at part load, where the differences between burners show.

Questions buyers ask at this size

What does a 5 t/h steam boiler cost?

Indicative 2026 EXW range: $34k–$52k for a gas/oil packaged unit, $47k–$68k for a biomass chain-grate unit. Pressure, burner class, economiser and auxiliary scope move the figure by 20–40%.

How much gas does a 5 t/h boiler burn per hour?

About 384 Nm³/h at full load, assuming 8,500 kcal/Nm³ and 92% thermal efficiency. That is roughly $176 per hour at 0.46 USD/Nm³.

Is 5 t/h the largest packaged fire-tube boiler?

Not strictly — packaged fire-tube units exist up to about 8 t/h. But above 5 t/h the shell becomes awkward to transport and the water-tube alternative starts to win on footprint and response, so 5–6 t/h is the practical upper end of the fire-tube market.

What is 5 t/h in MW and kcal per hour?

5 t/h is about 3.50 MW, 3,000,000 kcal/h, or roughly 320 boiler horsepower.

Sources and further reading

Fuel prices and efficiencies are stated assumptions for comparison, not quotations. Local fuel quality, altitude, feedwater temperature and part-load operation all shift the real number.

Request a quote

Tell us the capacity, fuel and working pressure. Our engineers reply with a technical proposal within one working day.

Or email [email protected] directly.

Partners

Become a Yuanda Boiler agent

We appoint one or two partners per country to quote, deliver and service our boilers locally. Territory protection, factory pricing and commissioning support are part of the agreement.

Apply as an agent
WhatsApp [email protected]
Call WhatsApp Email Get a quote